Search Results for garage tile flooring
- garage shelving storage
- garage shop plan
- garage slab
- garage steel
- garage storage
- garage storage cabinet
- garage storage container
- garage storage plan
- garage storage project
- garage storage rack
- garage storage shed
- garage storage shelving
- garage storage solution
- garage storage space
- garage storage system
- garage storage unit
- garage storage wall cabinet
- garage tile flooring
- garage toms
- garage tool cabinet
- garage tool storage
- garage underground
- garage ventilation
- garage wall cabinet
- garage wall paint
- garage wall panel
- garage wall storage
- garage wall storage system
- garbage
- garbage bag
|
|
| Government Bids |
Result 1 - 9 of 9 Document(s) |
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Aug 08, 2008
......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Aug 04, 2008
......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Aug 01, 2008
......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 14, 2008
......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 13, 2008
......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 09, 2008
......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 05, 2008
......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Apr 18, 2008
......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Apr 03, 2008
......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
|
 |
|
|
Copyright 2004 GovCB.com All rights reserved
4855 River Green Pkwy, Suite 510, Duluth, GA 30096
|
|