Government contract and bid
About Us Sitemap Help Sign In
Home : Alphabetical List : g and h auto : garage tile flooring

Search for Active Government Bids:  

Search Results for garage tile flooring


Related Keywords

  1. garage shelving storage
  2. garage shop plan
  3. garage slab
  4. garage steel
  5. garage storage
  6. garage storage cabinet
  7. garage storage container
  8. garage storage plan
  9. garage storage project
  10. garage storage rack
  11. garage storage shed
  12. garage storage shelving
  13. garage storage solution
  14. garage storage space
  15. garage storage system
  16. garage storage unit
  17. garage storage wall cabinet
  18. garage tile flooring
  19. garage toms
  20. garage tool cabinet
  21. garage tool storage
  22. garage underground
  23. garage ventilation
  24. garage wall cabinet
  25. garage wall paint
  26. garage wall panel
  27. garage wall storage
  28. garage wall storage system
  29. garbage
  30. garbage bag
 
Government Bids Result 1 - 9 of 9 Document(s)

DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Aug 08, 2008

......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Aug 04, 2008

......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Aug 01, 2008

......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 14, 2008

......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 13, 2008

......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 09, 2008

......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 05, 2008

......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Apr 18, 2008

......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Apr 03, 2008

......for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...floor coverings over repaired wood flooring, new wall and ceiling finishes. ...materials including asbestos lagging and tiles and lead based ...

 

Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved
4855 River Green Pkwy, Suite 510, Duluth, GA 30096