Search Results for garage floor design
- garage door service
- garage door size
- garage door spring
- garage door springs
- garage door vertical
- garage door window
- garage door wood prices
- garage electrical wiring
- garage entry door
- garage equipment
- garage equipment for car
- garage equipment manufacturer
- garage equipment supply
- garage floor
- garage floor clean
- garage floor cleaner
- garage floor coating
- garage floor cover
- garage floor design
- garage floor finish
- garage floor pad
- garage floor paint
- garage floor painting
- garage floor plan
- garage floor protection
- garage floor repair
- garage floor rubber tile
- garage floor seal
- garage floor stain
- garage floor system
|
|
| Government Bids |
Result 1 - 10 of 19 Document(s) |
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Aug 08, 2008
...DESIGN BUILD/...for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...former housing space with new floor coverings over repaired wood flooring, ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Aug 04, 2008
...DESIGN BUILD/...for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...former housing space with new floor coverings over repaired wood flooring, ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- Aug 01, 2008
...DESIGN BUILD/...for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...former housing space with new floor coverings over repaired wood flooring, ...deteriorated pavements, restoration of demolished garage areas, ...
Y--Firm-fixed price design-build construction contract for the 7th Army Command and Control Facility, including a Consolidated Operations Intelligence Center at Wiesbaden Army Airfield, Germany
- Jun 10, 2008
...Y--Firm-fixed price design-build construction contract for the ...shall contain a 130 seat operations floor with a separate war room and ...accordance with American standards, parking garage and a standby generator.d. Security ...
C--UPGRADE AND EXPAND ELECTRICAL CLOSETS B1 AE DESIGN
Michigan
- May 16, 2008
......Investigation, Planning, Engineering Studies, Schematics, Design Development, Construction Documents, Technical Specifications, ...lay-in ceilings on all floors and tag them and identify ...include site drawings, generator buildings, floor plans showing closet ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 14, 2008
...DESIGN BUILD/...for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...former housing space with new floor coverings over repaired wood flooring, ...deteriorated pavements, restoration of demolished garage areas, ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 13, 2008
...DESIGN BUILD/...for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...former housing space with new floor coverings over repaired wood flooring, ...deteriorated pavements, restoration of demolished garage areas, ...
C--Sioux Falls Reserve Center
Illinois
- May 10, 2008
......aside. This is a two-step design/build construction project, Request for ...with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry ...suspended ceiling, and vinyl tile floors. Parking area is ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 09, 2008
...DESIGN BUILD/...for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...former housing space with new floor coverings over repaired wood flooring, ...deteriorated pavements, restoration of demolished garage areas, ...
DESIGN BUILD/DESIGN BID BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR ADMINSITRATIVE FACILITIES, NAVFAC MID-ATLANTIC'S ENTIRE AREA OF RESPONSIBILITY (AOR) FROM NORTH CAROLINA TO MAINE, INCLUDING WEST VIRGINIA NAVAL FACILITIES ENGINEERING COMMAND
- May 05, 2008
...DESIGN BUILD/...for elevators and demolishes existing garages (Building 133 (1,155 SF), 136 (...former housing space with new floor coverings over repaired wood flooring, ...deteriorated pavements, restoration of demolished garage areas, ...
|
 |
|
|
Copyright 2004 GovCB.com All rights reserved
4855 River Green Pkwy, Suite 510, Duluth, GA 30096
|
|