Government contract and bid
About Us Sitemap Help Sign In
Home : Alphabetical List : corrosive liquid : cost gas natural

Search for Active Government Bids:  

Search Results for cost gas natural


Related Keywords

  1. cost freon
  2. cost friction
  3. cost fuel hydrogen
  4. cost fuel pump
  5. cost funeral
  6. cost furnace
  7. cost furniture plus
  8. cost gas natural
  9. cost gasoline
  10. cost genetic testing
  11. cost good open source
  12. cost goods manufactured
  13. cost goods produced purchased
  14. cost goods sold
  15. cost government index living
  16. cost gps low tracking vehicle
  17. cost grass sod
  18. cost ground in pool swimming
  19. cost gym membership
  20. cost hawaii trip
  21. cost health high insurance
  22. cost health in insurance low
  23. cost health increase insurance
  24. cost health individual insurance
  25. cost health insurance
  26. cost health insurance low
  27. cost health insurance low option
  28. cost health insurance low plan
  29. cost health insurance national
  30. cost health insurance no
 
Government Bids Result 1 - 10 of 38 Document(s)

Project Manager Page Back in List Page Forward in List Page 1 of 1 Help Desk - Phone: 303-894-2039 email: BIDS.Help@state.co.us Contact the Help Desk if you have registration questions, difficulty using our web site, downloading specifications, or downloading Adobe Reader.
Colorado - Oct 22, 2008

......Banking Services Research Services Utilities/Natural Gas/Electricity/Water Title:Project Manager ...deleted. Vendor's must submit anticipated costs and expenses in a format as ...the most value for the cost. 2) On Page 3, "...
Project Manager
Colorado - Oct 22, 2008

......Banking Services Research Services Utilities/Natural Gas/Electricity/Water Title:Project Manager ...deleted. Vendor's must submit anticipated costs and expenses in a format as ...the most value for the cost. 2) On Page 3, "...
Y--Design and Construction of Administrative Office Facility and Parking Structure at U.S. Garrison, Detroit Arsenal, Warren, Michigan
- Sep 09, 2008

......electricity, water and sewer service; natural gas connection; fire protection; paving, sidewalks, ...100,000,000.00. A construction cost limitation will be provided with ...
Y--Design and Construction of Administrative Office Facility and Parking Structure at U.S. Garrison, Detroit Arsenal, Warren, Michigan
- Sep 02, 2008

......electricity, water and sewer service; natural gas connection; fire protection; paving, sidewalks, ...100,000,000.00. A construction cost limitation will be provided with ...
Shop Improvements Project
New York - Aug 28, 2008

......shop reconfigurations will include electrical, natural gas, water, compressed air, drainage, and ...and utility work. The estimated cost of this project is between $...
TECHNOLOGY/BUSINESS OPPORTUNITY Versatile Optical Sensor for Detecting and Identifying Unknown Gases
California - Aug 14, 2008

......and identifying unknown gases. Background: Gas sensors are usually engineered to ...for continuous monitoring Lower operating costs Potential Applications: Continuous monitoring and ...pollution monitoring Locating victims after natural disasters or attacks ...
Y--Design and Construction of Administrative Office Facility and Parking Structure at U.S. Garrison, Detroit Arsenal, Warren, Michigan
- Aug 14, 2008

......electricity, water and sewer service; natural gas connection; fire protection; paving, sidewalks, ...100,000,000.00. A construction cost limitation will be provided with ...
Design/Build Boat Maintenance Facility, USCG Station New York, Staten Island, NY (Rosebank)
Rhode Island - Aug 13, 2008

......utilities including water, sewer, electric, natural gas, and telecommunications. Additional design and ...this project has established certain cost limitations for the project. No ...
Z--Renovate Building 299 to Accommodate the Relocation of the Metal Fabrication Facility to Rock Island Arsenal, IL
- Aug 01, 2008

......including water, electrical, sewer, and natural gas, employee access gate, paving, information ...and rated by the Government. Cost information will not be rated, ...
Supply and Installation of Energy Retrofits at Happy Valley Park Shower Building
Northwest Territories - Jul 31, 2008

......the shower building is utilizing natural gas for heating water. Installation of a ...to reduce operation and maintenace costs of the shower building. Similarly, ...
 1  Next 

 

Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved