Search Results for concrete cubic yard
- concrete crushing
- concrete cubic yard
- concrete cubic yard price
- concrete culvert
- concrete culvert pipe
- concrete culverts
- concrete curb
- concrete curb equipment
- concrete curb form
- concrete curbing
- concrete curbing equipment
- concrete curing
- concrete curing cover
- concrete curing time
- concrete cut off saw
- concrete cut saw
- concrete cutter
- concrete cutting
- concrete cutting chain saw
- concrete cutting company
- concrete cutting contractor
- concrete cutting equipment
- concrete cutting saw
- concrete cutting slab
- concrete cutting tool
- concrete dallas equipment
- concrete deck block
- concrete deck coating
- concrete deck construction
- concrete deck design
|
|
| Government Bids |
Result 1 - 10 of 52 Document(s) |
Construction of Waste Solidification Building
- Sep 30, 2008
......will contain approximately 10,000 cubic yards of concrete. The engineering estimate is approximately $...
WASTE CONTAINERS
Virginia
- Sep 26, 2008
......Supplies/Services CLIN 0001 - 40 CUBIC YARD METAL DISPOSAL CONTAINER. DISPOSAL BI- ...QUANTITY: 1 CLIN 0007 - 20 CUBIC CONCRETE DISPOSAL CONTAINER. CONTRACTOR WILL BE ...
Z--Environmental Restoration of the Mill River and Mill Pond, Stamford, Connecticut
- Sep 13, 2008
......is degraded with a ten-foot concrete dam, a sediment laden impoundment, ...off-site of approximately 5,800 cubic yards of sediment behind the dam; ...
Z--Environmental Restoration of the Mill River and Mill Pond, Stamford, Connecticut
- Sep 11, 2008
......is degraded with a ten-foot concrete dam, a sediment laden impoundment, ...off-site of approximately 5,800 cubic yards of sediment behind the dam; ...
Z--Environmental Restoration of the Mill River and Mill Pond, Stamford, Connecticut
- Sep 10, 2008
......is degraded with a ten-foot concrete dam, a sediment laden impoundment, ...off-site of approximately 5,800 cubic yards of sediment behind the dam; ...
8322 Bridge Site Prep
Nebraska
- Aug 29, 2008
......includes; excavation of approximately 800 cubic yards of compacted roadbed material; excavation ...two cast-in-place reinforced concrete bridge abutments; sorting, hauling, and ...
Z--Environmental Restoration of the Mill River and Mill Pond, Stamford, Connecticut
- Aug 23, 2008
......is degraded with a ten-foot concrete dam, a sediment laden impoundment, ...off-site of approximately 5,800 cubic yards of sediment behind the dam; ...
8322 Bridge Site Prep
Nebraska
- Aug 21, 2008
......includes; excavation of approximately 800 cubic yards of compacted roadbed material; excavation ...two cast-in-place reinforced concrete bridge abutments; sorting, hauling, and ...
Z--Environmental Restoration of the Mill River and Mill Pond, Stamford, Connecticut
- Aug 13, 2008
......is degraded with a ten-foot concrete dam, a sediment laden impoundment, ...off-site of approximately 5,800 cubic yards of sediment behind the dam; ...
Y--Waterfront Structures improvements of Plum Island Harbor and maintenance dredging at Plum Island Harbor and Orient Point Harbor, New York.
- Aug 08, 2008
......possible removal of an existing concrete retaining wall and substructure. About ...dredging of approximately 28,865 cubic yards of material to the required ...
|
 |
|
|
Copyright 2004 GovCB.com All rights reserved
|
|