Government contract and bid
About Us Sitemap Help Sign In
Home : Alphabetical List : city of phoenix fire department : closet design project system

Search for Active Government Bids:  

Search Results for closet design project system


Related Keywords

  1. closet design online
  2. closet design organization
  3. closet design plan
  4. closet design project system
  5. closet design software
  6. closet design space
  7. closet design storage
  8. closet design tool
  9. closet door
  10. closet door design
  11. closet door hardware
  12. closet door installation
  13. closet door system
  14. closet door through
  15. closet door track
  16. closet garage storage
  17. closet hardware
  18. closet in reach storage
  19. closet in storage walk
  20. closet in trap
  21. closet linen
  22. closet maid
  23. closet maries
  24. closet organization
  25. closet organization system
  26. closet remodel
  27. closet renovation
  28. closet restroom water
  29. closet rod
  30. closet rods
 
Government Bids Result 1 - 10 of 12 Document(s)

Y--DESIGN-BUILD CONSTRUCTION OF MARKET STYLE BACHELOR ENLISTED QUARTERS (BEQ) IN NEW ORLEANS, LA.
Florida - Jun 20, 2008

...Y--DESIGN-BUILD CONSTRUCTION OF MARKET STYLE ...siding, standing metal seam roof system; mechanical/electrical systems; heating, ventilation and air conditioning; ...in each bedroom) with four closets, two bathrooms, a full kitchen, ...
C--UPGRADE AND EXPAND ELECTRICAL CLOSETS B1 AE DESIGN
Michigan - May 16, 2008

......C--UPGRADE AND EXPAND ELECTRICAL CLOSETS B1 AE DESIGNSolicitation Number: VA-...Investigation, Planning, Engineering Studies, Schematics, Design Development, Construction Documents, Technical Specifications, ...related information for the subject project. This announcement is ...
C--UPGRADE PRIMARY ELECTRICAL DISTRIBUTION SYSTEM ANDCORRECT ELECTRICAL DEFICIENCIES BLDGS 3 & 4
Michigan - May 16, 2008

......C--UPGRADE PRIMARY ELECTRICAL DISTRIBUTION SYSTEM ANDCORRECT ELECTRICAL DEFICIENCIES BLDGS 3 & 4Solicitation ...Investigation, Planning, Engineering Studies, Schematics, Design Development, Construction Documents, Technical Specifications, ...related information for the subject project. This announcement is ...
C--Architect and Engineering Services
Indiana - May 13, 2008

......firms. North American Industrial Classification System code is 541310 which has a ...awarded in June 2008 and design completed by August 2008. To ...expert supervision necessary to design Project Number 583-08-...
C--Architect and Engineering Services
Indiana - May 06, 2008

......firms. North American Industrial Classification System code is 541310 which has a ...awarded in June 2008 and design completed by August 2008. To ...expert supervision necessary to design Project Number 583-08-...
C--Mental Health Environment of Care
Indiana - May 02, 2008

......VA Northern Indiana Health Care System (Ft. Wayne Campus)Location: Department ...Care facilities to provide a complete A/E design for Project 550-08-123, Mental Health ...conference; mechanical spaces and telephone closets; required ...
C--Indefinite Quantity Architect-Engineer Services for Preparation of Plans and Specifications for Bachelor Quarters and Other Architectural Projects, Various Locations, NAVFAC Hawaii
- Apr 29, 2008

......Bachelor Quarters and Other Architectural Projects, Various Locations, NAVFAC HawaiiSolicitation Number: ...but are not limited to design and engineering services for various ...may include a kitchen, walk-in closet and common areas ...
Y--FY08 Railroad Upgrade, Fort Lewis, Washington
- Apr 17, 2008

......for any questions regarding this project. The Seattle Distri ct Corps ...both widening and lengthening. The design removes a total of 4 existing tracks ...with shower, electrical and communications closets, the shop area (...
Y--FY08 Railroad Upgrade, Fort Lewis, Washington
- Apr 17, 2008

......for any questions regarding this project. The Seattle Distri ct Corps ...both widening and lengthening. The design removes a total of 4 existing tracks ...with shower, electrical and communications closets, the shop area (...
Y--FY08 Railroad Upgrade, Fort Lewis, Washington
Washington - Mar 10, 2008

......for any questions regarding this project. The Seattle Distri ct Corps ...both widening and lengthening. The design removes a total of 4 existing tracks ...with shower, electrical and communications closets, the shop area (...
 1  Next 

 

Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved