Search Results for backfill material
- back way when
- back welcome
- back when
- back where i come from
- back where we started
- back yard
- back yard design
- back yard party
- back yard plan
- back zipper
- backboard
- backboard glass
- backboard strap
- backed
- backed double harness
- backed loan securities
- backed message new post
- backed service
- backed up
- backed up sewer
- backed up toilet
- backer
- backer opening them
- backer rod
- backfill
- backfill foundation
- backfill landscaping
- backfill material
- backflush
- background
|
|
| Government Bids |
Result 1 - 10 of 75 Document(s) |
SBR - REMOVAL & REPLACEMENT OF UNDERGROUND FUEL STORAGE TANKS AT GLEN BURNIE DISTRICT COURT (BC-764-071-001)
Maryland
- Sep 12, 2008
......PRICE NO. 2: SELECTED BACKFILL-INSERT A COST PER ...REPLACE SELECTED BACKFILL MATERIAL AS DESCRIBED IN ...
(DGS PROJECT NO. VC-005-070-001) EXPANSION OF BURIAL CAPACITY AT GARRISON FOREST VETERANS CEMETERY
Maryland
- Aug 26, 2008
......REMOVAL OF UNSUITABLE MATERIAL (BACKFILL WITH COMMON FILL ...
Z--San Pedro Preserve Pond Lining
- Aug 26, 2008
......installing HDPE liner, backfill and compaction of ...compaction of excavated material, placement of a reinforced ...
Water Backflow Prevention Device
New York
- Aug 25, 2008
......provide all labor, materials, supplies, tools, etc, ...of select granular backfill in all excavated ...areas. The backfill material shall be NYSDOT ...
38--Construction Equipment with Operator
- Aug 21, 2008
......and gravel, spreading backfill, and demolition of ...includes hauling of materials for excavation of ...for loading, spreading material and sweeping streets. ...
Y--FC/MR&T, Yazoo Basin, Hickahala Creek Watershed, Tate County, MS, Mississippi Delta Headwaters Project, Box Culvert Grade Control Structures, BC-04-02
- Aug 14, 2008
......all plant, labor, materials and equipment, and ...reinforced concrete pipe, backfill, select fill, engineering ...
Rager Ranger Station Water System Improvements
- Aug 06, 2008
......bedding, compaction and backfill of water lines. ...cross various surface materials that will require ...
Z--San Pedro Preserve Pond Lining
- Aug 06, 2008
......installing HDPE liner, backfill and compaction of ...compaction of excavated material, placement of a reinforced ...
66--CRYSTAL CASTING
Ohio
- Aug 03, 2008
......sufficient master melt material for one mold (...Hold for 20mins. Backfill furnace with 400+/-...
Ditch Creek Bridge Replacement
- Jul 31, 2008
......structure excavation and backfill; furnishing and installing ...wearing surface; waste material disposal; providing and ...furnish all labor, materials, equipment, tools, transportation, ...
|
 |
|
|
Copyright 2004 GovCB.com All rights reserved
|
|