Government contract and bid
About Us Sitemap Help Sign In

Search for Active Government Bids:  

Search Results for backed


Related Keywords

  1. back way when
  2. back welcome
  3. back when
  4. back where i come from
  5. back where we started
  6. back yard
  7. back yard design
  8. back yard party
  9. back yard plan
  10. back zipper
  11. backboard
  12. backboard glass
  13. backboard strap
  14. backed
  15. backed double harness
  16. backed loan securities
  17. backed message new post
  18. backed service
  19. backed up
  20. backed up sewer
  21. backed up toilet
  22. backer
  23. backer opening them
  24. backer rod
  25. backfill
  26. backfill foundation
  27. backfill landscaping
  28. backfill material
  29. backflush
  30. background
 
Government Bids Result 1 - 10 of 40 Document(s)

Project Scope: Provide necessary labor and material required to connect the Alumni and Foundation buildings to the campus 13,800 volt electrical distribution system which is backed up by the standby power generator.
Minnesota - Sep 15, 2008

......800 volt electrical distribution system which is backed up by the standby power generator. FURTHER ...
USAF Band Lighting Equipment
District of Columbia - Sep 11, 2008

......brand rivets. 1.4 All rivets are to be backed by aluminum extrusions or washers where rivets ...
99--HABITABILITY
Florida - Sep 09, 2008

......Provide and install new polyvinyl chloride aluminum backed ceiling panels. 8. Reinstall ventilation dampers and diffusers. 9. ...
99--HABITABILITY
Florida - Sep 08, 2008

......Provide and install new polyvinyl chloride aluminum backed ceiling panels. 8. Reinstall ventilation dampers and diffusers. 9. ...
20--ROMOR I STAVE BEARINGS
Virginia - Sep 05, 2008

......10-May-2005,(B) Class III, non-metallic backed(C) Per Mil-Dtl_17901C (SH) Section 3.2(D) Size ...10-May-2005,(B) Class III, non-metallic backed(C) Per Mil-Dtl_17901C (SH) Section 3.2(D) Size ...
F--This requirement is issues as a simplified commercial item acquisition. The requirement is issued for 12 ea rain gauge configured as specified. The item ordered may include wind screen as specified in schedu
Colorado - Sep 03, 2008

......tables with a time stamp and record numberBattery-backed SRAM memory and clock ensuring data, programs, ...
Z--Replace steel-backed timber guardrail and timber support posts.
- Sep 02, 2008

...Z--Replace steel-backed timber guardrail and timber support posts.Solicitation ...02, 2008 10:48 am Replace steel-backed timber guardrail and timber support posts The ...
F--This requirement is issues as a simplified commercial item acquisition. The requirement is issued for 12 ea rain gauge configured as specified. The item ordered may include wind screen as specified in schedu
Colorado - Aug 28, 2008

......tables with a time stamp and record numberBattery-backed SRAM memory and clock ensuring data, programs, ...
Overlayer Pressure Chromatograph System
- Aug 25, 2008

......for the 20 x 20 cm columns. A glass backed column should achieve separation of 500 mg. ...
U--Educational support services
New Mexico - Aug 15, 2008

......based discussion forums to online commerce, database-backed dyn...
 1  Next 

 

Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved