- air condition refrigeration
- air condition rental
- air condition repair
- air condition repair do it yourself
- air condition repair service
- air condition residential
- air condition review
- air condition room
- air condition sale
- air condition school
- air condition service
- air condition services
- air condition split
- air condition split unit
- air condition supplier
- air condition supply
- air condition system
- air condition tent
- air condition thermostat
- air condition tool
- air condition train
- air condition trane
- air condition troubleshooting
- air condition unit
- air condition unit wall
- air condition unit window
- air condition vent
- air condition window
- air condition york
- air conditional
|
|
| Government Bids |
Result 1 - 10 of 159 Document(s) |
FORK TRUCK TIRE PRESS
Virginia
- Nov 14, 2008
......to provide 15 of travel, Air Powered, Ram Speed Advance 1-1/2 Return ...52.212-4 Contract Terms and Conditions-Commercial Items; Addendum to 52....252.247-7023 Transportation of Supplies by Sea Alternate ...
66--Purchase of Supplies - Yuma, AZ - GLI Brand Turbidity Analyzers
Arizona
- Nov 14, 2008
...66--Purchase of Supplies - Yuma, AZ - GLI Brand Turbidity ...at 68 F (0-3.4 bar at 20 C)Air Venting ................................. Integral bubble trap for 0....00-20.00 mA Ambient Conditions:Operation.............................. -4 to +140 F (-20 to +...
S--Privatization of the natural gas distribution system for the Yeager Air National Guard Base located in Charleston West Virginia
West Virginia
- Nov 07, 2008
......distribution system for the Yeager Air National Guard Base located in ...utility system in a safe, reliable condition and to meet the requirements ...built were Building 101-Base Supply, Building 107-Maintenance ...
Nondestructive Evaluation (NDE) Exploratory Development for Air Force Systems
Ohio
- Nov 04, 2008
......Evaluation (NDE) Exploratory Development for Air Force Systems Solicitation Number: FA8650-...of equipment in a satisfactory operating condition, handling and disposing of hazardous ...USAF regulations, and provision of supplies not readily available ...
65-- Ventilated Sealsafe Mouse Racks, Tecniplast
Virginia
- Nov 03, 2008
......BOX110SS 3 Touch SlimLine Plus Equipment Air handling Units Model BOX110SS with ...handling Units Model BOX110SS with supply and exhaust Fan units, HEPA ...52.212-4 Contract Terms and Conditions-Commercial Items (Sep ...
VRR-06-007 PIPING MOD
Virginia
- Oct 28, 2008
......in upper AMR Remove existing 1/2" supply piping and replace with 3/4" CUNI ...Operate and inspect processor, determine condition, submit report and recommendations. VRR ...operation. Record current flow and air flow while unit ...
Repair Items for NOV VRR
Virginia
- Oct 24, 2008
......in upper AMR Remove existing 1/2" supply piping and replace with 3/4" CUNI ...Operate and inspect processor, determine condition, submit report and recommendations. VRR ...operation. Record current flow and air flow while unit ...
Repair Items for NOV VRR
Virginia
- Oct 21, 2008
......in upper AMR Remove existing 1/2" supply piping and replace with 3/4" CUNI ...Operate and inspect processor, determine condition, submit report and recommendations. VRR ...operation. Record current flow and air flow while unit ...
70--Misc IT Hardware and Software for Kabul
Virginia
- Sep 26, 2008
......with the approved Terms and Conditions of their respective GSA Schedule ...with 48x Max SpeedRedundant Power Supply (750W)User's Guide and Installation & ...Rack Deeper 26URACK2K CABINET 264U, AIR SHIPPING, FRAME. DOOR & ...
43--Air Compressor Package
North Carolina
- Sep 25, 2008
...43--Air Compressor PackageSolicitation Number: W91247-08-T-...between 60 to 100% of supply output. Automatic Restart after Power ...with the below terms and conditions may result in offer being ...
|