Government contract and bid
About Us Sitemap Help Sign In
Home : Alphabetical List : aging : air condition repair

Search for Active Government Bids:  

Search Results for air condition repair


Related Keywords

  1. air condition refrigeration
  2. air condition rental
  3. air condition repair
  4. air condition repair do it yourself
  5. air condition repair service
  6. air condition residential
  7. air condition review
  8. air condition room
  9. air condition sale
  10. air condition school
  11. air condition service
  12. air condition services
  13. air condition split
  14. air condition split unit
  15. air condition supplier
  16. air condition supply
  17. air condition system
  18. air condition tent
  19. air condition thermostat
  20. air condition tool
  21. air condition train
  22. air condition trane
  23. air condition troubleshooting
  24. air condition unit
  25. air condition unit wall
  26. air condition unit window
  27. air condition vent
  28. air condition window
  29. air condition york
  30. air conditional
 
Government Bids Result 1 - 10 of 95 Document(s)

S--Privatization of the natural gas distribution system for the Yeager Air National Guard Base located in Charleston West Virginia
West Virginia - Nov 07, 2008

......distribution system for the Yeager Air National Guard Base located in ...responsibility for the operations, maintenance, repair, future upgrades, and future utility ...Contractor shall manage the maintenance, repairs, replacement, etc., of ...
Z--Pump Station Repairs (PL84-99), Stage IIA/IIB, Hunt Drainage District, Mississippi River, Hancock County, Illinois
- Nov 04, 2008

...Z--Pump Station Repairs (PL84-99), Stage IIA/IIB, ...place. All necessary components to repair the existing pump station building ...back to its pre-flood condition. Including but not limited to ...
ADG Repairs for USNS MERCY
Virginia - Nov 03, 2008

...ADG Repairs for USNS MERCY Solicitation Number: ...of two (2) each used Charge Air, Two (2) each Turbochargers for ...as found and as released conditions with digital pictures of the ...
Z--Pump Station Repairs (PL84-99), Stage IIA/IIB, Hunt Drainage District, Mississippi River, Hancock County, Illinois
- Oct 31, 2008

...Z--Pump Station Repairs (PL84-99), Stage IIA/IIB, ...place. All necessary components to repair the existing pump station building ...back to its pre-flood condition. Including but not limited to ...
F--Remedial Action Operation Multiple Award Contract(s) for Projects within the Area of Responsibility of NAVFAC MIDLANT.
- Oct 30, 2008

......may include: * Operation, maintenance, inspection, repairs, modifications and removal and dismantling ...caps and RCRA landfill caps - Air sparging, soil vapor extraction, bioslurper ...areas to safe and acceptable condition* Treatment systems can ...
S--Utilities Privatization
Pennsylvania - Oct 30, 2008

......distribution system for the Pennsylvania Air National Guard Base (ANGB) located ...responsibility for the operations, maintenance, repair, future upgrades, and future utility ...Contractor shall manage the maintenance, repairs, replacement, etc., of ...
VRR-06-007 PIPING MOD
Virginia - Oct 28, 2008

......066 Stbd Potable water riser repair. Location approx frame 55, 01 ...Operate and inspect processor, determine condition, submit report and recommendations. VRR ...operation. Record current flow and air flow while unit ...
Repair Items for NOV VRR
Virginia - Oct 24, 2008

...Repair Items for NOV VRRSolicitation Number: ...Operate and inspect processor, determine condition, submit report and recommendations. VRR ...operation. Record current flow and air flow while unit is operating ...
Repair Items for NOV VRR
Virginia - Oct 21, 2008

...Repair Items for NOV VRRSolicitation Number: ...Operate and inspect processor, determine condition, submit report and recommendations. VRR ...operation. Record current flow and air flow while unit is operating ...
Repair Water Well
California - Oct 20, 2008

...Repair Water WellSolicitation Number: F4D3D98275A001Agency: Department ...Number: F4D3D98275A001Agency: Department of the Air ForceOffice: ...shall pull and inspect operational conditions of pump shaft (380 feet). 4) ...well piping column for operational condition. 6) The ...
 1  Next 

 

Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved