Government contract and bid
About Us Sitemap Help Sign In

Search for Active Government Bids:  

Search Results for acm


Related Keywords

  1. acl surgeries
  2. acm
  3. acm aviation
  4. acm award
  5. acm award performance
  6. acm award result
  7. acm central
  8. acm communication
  9. acm design
  10. acm funds
  11. acm performance
  12. acm result
  13. acm system
  14. acme
  15. acme auto
  16. acme display
  17. acme electric
  18. acme food
  19. acme made
  20. acme thread
  21. acme threads
  22. acog scope
  23. acom
  24. acord certificate of insurance
  25. acord certificate of liability ...
  26. acorn
  27. acorn com
  28. acorn engineering
  29. acorn engineering company
  30. acorn hardware
 
Government Bids Result 1 - 10 of 55 Document(s)

Z--RENOVATION OF WING D, BUILDING 11 SECOND FLOOR, TOBYHANNA ARMY DEPOT, TOBYHANNA PA.
- Jun 03, 2008

......of interior finishes; limited Asbestos-Containing Material (ACM) abatement; removal and replacement of interior lighting, ...
KODIAK READINESS CENTER ADDITION/ALTERATION (RFP 2008)
Alaska - May 30, 2008

......included in the project. Asbestos contaminated material (ACM) has been identified within the project limits. ...limits. Abatement or containment, of the known ACM within the project limits is also a part ...
Z--RENOVATION OF WING D, BUILDING 11 SECOND FLOOR, TOBYHANNA ARMY DEPOT, TOBYHANNA PA.
- May 23, 2008

......of interior finishes; limited Asbestos-Containing Material (ACM) abatement; removal and replacement of interior lighting, ...
Z--Valentine National Wildlife Refuge (NWR)Machine Shed Re-roofing, this was originally solicitation # 601818R783.
- May 22, 2008

......disposed of properly as asbestos containing material (ACM) off the machine roof, asset #10030533.2. Installation ...disposal of all removed roofing materials and ACM. The period of performance is 60 calendar ...
Y--Ft Niobrara-Valentine National Wildlife Refuge Reroofing
- May 22, 2008

......disposed of properly as asbestos containing material (ACM) off the machine roof, asset #10030533.2. Installation ...disposal of all removed roofing materials and ACM. The period of performance is 60 calendar ...
KODIAK READINESS CENTER ADDITION/ALTERATION (RFP 2008)
Alaska - May 21, 2008

......included in the project. Asbestos contaminated material (ACM) has been identified within the project limits. ...limits. Abatement or containment, of the known ACM within the project limits is also a part ...
C--ARCHITECT/ENGINEER SERVICES for projectentitled "B5/6 Asbestos Removal"
Colorado - May 19, 2008

......Domestic water and steam/condensate piping with ACM coverings may be removed and replaced if ...
Z--RENOVATION OF WING D, BUILDING 11 SECOND FLOOR, TOBYHANNA ARMY DEPOT, TOBYHANNA PA.
- May 16, 2008

......of interior finishes; limited Asbestos-Containing Material (ACM) abatement; removal and replacement of interior lighting, ...
Multiple Award Task Order Contract (MATOC) in Support of the BRAC Program under the jurisdiction of the Norfolk District and North Atlantic Division, Corps of Engineers
Virginia - May 15, 2008

......based paint (LBP) and asbestos containing materials (ACM) and mold containing materials (MCM). Facility repairs, ...
KODIAK READINESS CENTER ADDITION/ALTERATION (RFP 2008)
Alaska - May 15, 2008

......included in the project. Asbestos contaminated material (ACM) has been identified within the project limits. ...limits. Abatement or containment, of the known ACM within the project limits is also a part ...
 1  Next 

 

Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved
4855 River Green Pkwy, Suite 510, Duluth, GA 30096