Search Results for a b frost
- a a sprinkler lawn service
- a amp r
- a and b sound
- a and d spec
- a and e channel
- a and e television
- a and e tv
- a and e tv channel
- a arm bushings
- a ask in interview question should ...
- a b and t sales
- a b b in vancouver bc
- a b c book
- a b c kid
- a b chance
- a b collision
- a b d electric
- a b frost
- a b sound
- a b switch
- a back flip easy
- a back walk over
- a band called live
- a battery car charge how to
- a believe a can fly
- a bell will ring
- a bend in the river
- a best buy of the time to vehicle ...
- a better chance
- a bevel angle
|
|
| Government Bids |
Result 11 - 20 of 50 Document(s) |
Y--Kipp Water System 2008
- Jul 09, 2008
......of funding replace curb stops, wastes, and frost free hydrants. Bid Schedule is as follows: 1) ...
Quarry Hill Perimeter Fence
Alaska
- Jul 01, 2008
......Repair loose and damaged barbed wire. (3) Repair frost jacking. (4) Corner posts, pull posts, and line ...
Frost Mediation on the exterior wall of the office portion of the building (1st and 2nd floors). Removal of existing gypsum board and fiberglass insulation on the interior face of the exterior walls. Installation of closed cell foam insulation, reinstall the gypsum board. Paint walls and reinstall other finish items. This is a TG/ED preference. Proj. Est. $480,000 - $530,000. Please fax request for plans and specs to 651/282-9904, attn: Diana McGee. DO NOT CALL THE PROJECT MANAGER FOR PLANS OR SPECS. Plans will be sent out by US mail, if you want over night delivery, please include your UPS or FedEx account number on the fax. REFER TO PROJECT 08-5565 when faxing request. For a list of planholders and/or bid results, please fax request to 651/282-9904, attn: Diana McGee.
Minnesota
- Jun 09, 2008
......LOCATION OF WORK: St. Cloud Headquarters DESCRIPTION: Frost Mediation on the exterior wall of the ...
Structured Cabling System
Massachusetts
- Jun 03, 2008
......IDFs and main switch room located in Frost building 1st floor south end tel/data ...
66--INDICATOR,FROST POI
Pennsylvania
- May 23, 2008
...66--INDICATOR,FROST POISolicitation Number: N0010408RWA64Agency: Department of the NavyOffice: ...
Owl Creek Packer Camp Water System Improvements
Montana
- May 21, 2008
......galvanized waterline, valve boxes, ball valves, and frost free water hydrants. The work also includes ...
Structured Cabling System
Massachusetts
- May 21, 2008
......campus center)and main switch room in Frost building tel/data room. Related Contract Number: ...
Z -- Repair Taxiways Phase III & Taxiway Lighting
- May 19, 2008
......130-150,000 cubic yards of non-frost susceptible fill material. Installation of approximately 1000LF ...
UK Spec Fridge/Freezers
- May 14, 2008
......or equal_item conform to specifications. 1. Whirlpool Frost Free Fridge/Freezer Part # ARC 7593 or ...
Owl Creek Packer Camp Water System Improvements
Montana
- May 07, 2008
......galvanized waterline, valve boxes, ball valves, and frost free water hydrants. The work also includes ...
|
 |
|
|
Copyright 2004 GovCB.com All rights reserved
4855 River Green Pkwy, Suite 510, Duluth, GA 30096
|
|