Del-Jen, Inc a Fluor Company is soliciting bids from a qualified vendor to provide re-roofing of three building per SOW's below and will be performed at the Albuquerque Job Corps Center. Albuquerque Job Corps is an national training and employment program administered by the Department of Labor to address the multiple barriers to employment faced by disadvantage youths.
Qualified supplier will provide material, labor, equipment, and removal of debris needed to perform the following scope of work's. Provide roofing manufacturer's standard 20 year warranty. All work to be accomplished in accordance with NRCA, Davis Bacon Act, and comply with Job Corps center rules and policies. Supplier will also provide proof of Certificate of Liability insurance. A total of three building to be re-roofed accepting bid's as individual bids per building or as a complete package for all three buildings. Walk thru is at the suppliers convenience and will be done before March 28, 2008. Walk thru appointment will be made thru Mr. Ken Deal, Maintenance Manager at 505/366-1249.
1st S.O.W - PR#44978 Y&Z; Buildings
The flashing at the roof edge and the roof membrane are falling, allowing water to saturate the structural cementitious fiber roof deck system, this is causing its deterioration. Deteriorated roof decking was observed at up too ten locations, ranging in size from ten to a hundred square feet each.
Contractor will remove the build-up roofing, flashing, and roof deck in the effected area and replace them with matching, compatible materials. Energy Star high reflectance and high emissivity, scrim-reinforced, thermoplastic polyolefin (TPO) .060" nominal thickness will be installed. Consideration should be given to replacing the entire built-up roofing and flashing system, and providing gutters and down spouts, in conjunction with repair of the deficiency. Repairs require 400 LF of flashing, 1000' SF roof decking, 300 LF gutters and 200 LF downspouts with 12 splash blocks.
2nd S.O.W - PR#44975 C Building
The built-up roof of the building leaks and has caused exterior wood soffit and interior ceiling damage in the past. The roof has undergone numerous repairs.
Contractor will remove existing BUR and rigid insulation and replace with single ply as follows: approximately 11,000 SF of R30 rigid insulation and with Energy Star high reflectance and high emissivity, scrim-reinforced, thermoplastic polyolefin (TPO) .060" nominal thickness. Provide tapered insulation to achieve positive slop to perimeter gutters. Remove and repair wood soffit (900 SF. Remove and replace all flashing and counter flashing in the affected areas (12"x200'). Replace gutters and down spouts on the southeast side of the building.
3rd S.O.W. - PR# 44976 O Building
The built-up roofs of the building over the activity room and the stage leak and have caused interior ceiling damage.
Contractor will remove existing BUR and rigid insulation in the two areas referenced above and replace with single ply as follows: approximately 1,500 SF over the stage and 4,300 SF over the activity area of R30 rigid insulation and with Energy Star high reflectance and high emissivity, scrim-reinforced, thermoplastic polyolefin (TPO) .060" nominal thickness. Provide tapered insulation to achieve positive slope to perimeter gutters. Remove and replace approximately 30 SF of acoustical tile. Remove and replace all flashing and counter-flashing in the affected area (12"x300').