Added: Aug 11, 2008 1:51 pm
Item: 0001NSN: 6685015239632JFJF Transmitter, TemperaP/N: 1960M40P07, Description: Transmitter, Temperataure, Electrical, Resistance; styledesignator: F1 Transmitter, 24V DC; Distance across wrenching surfaceflats: 3.160" nominal; Overall Length: 19.175" minimum and 19.211:maximum; Terminal Type and Qty: 1 connector; Accomodated Contact Typeand Qty: 5 PIN; special features: hardness critical item: tested by NSN4920-01--146-0702 test stand; end item ID: F101-GE-102;F110-ge-129engine; part name assigned by controlling agency: pyrometer.
PR Number(s): FD20300781743Item: 0001AAP/N: 1960M40P07, Description: The purpose of this unit is to provide the standard forpyrometer 1960M40P07. This part will be used to verify the technicalrepair center test stand is functioning identical to, or within anacceptable variance of the OEM production test stand. An acceptablevariance shall have no more than a 5 percent variance.Total Line Item Qty: 1.0000
Destn: IAW1423 Delivery - 90 Days ARO, 1.00each
PR Number(s): FD20300781743Item: 0001ABNSN: 6685015239632JFJF TRANSMITTER,TEMPERAP/N: 1960M40P07, Description: The purpose of this line item is to include three test runreports verifying the Gold Plate pyrometer is acceptable and has avariance of no more than 5 percent when compared between all three testruns. (See CDRL A001)Total Line Item Qty: 3.0000
Destn: IAW1423 Delivery - 90 Days ARO, 3.00each
PR Number(s): FD20300781743, FD20300870029Item: 0001ACNSN: 6685015239632JFJF TRANSMITTER,TEMPERAP/N: 1960M40P07, Description: Total Line Item Qty: Ranges: 1-125 each and 126-254 each
Destn: FB2039,Tinker AFB,OK.,73145-9013. Delivery - 248 Days ARO
Electronic procedure will be used for this solicitation. The proposed contract action is for supplies and services for which theGovernment intends to solicit and negotiate with only one, or a limitednumber of sources under the authority of FAR 6.302. Interested personsmay identify their interest and capability to respond to the requirementor submit proposals. This notice of intent is not a request forcompetitive proposals. However, all proposals received within fortyfive-days (thirty days if award is issued under an existing basicordering agreement) after date of publication of this synopsis will beconsidered by the Government. A Determination by the Government not tocompete this proposed contract based upon responses to this notice issolely within the discretion of the Government. Information receivedwill normally be considered solely for the purpose of determiningwhether to conduct a competitive procurement.
See Note(s) 26.