| Title: CONSTRUCTION OF GALVESTON ISLAND SEAWALL HANDICAP ACCESS RAMP GALVESTON, TEXAS |
| Program Summary |
 |
| Title: |
Title: CONSTRUCTION OF GALVESTON ISLAND SEAWALL HANDICAP ACCESS RAMP GALVESTON, TEXAS |
| GovCB Opps ID : |
ADP12095700140000307 |
| FSC Code: |
y - Construction of Structures and Facilities z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No.: |
81469-HR | |
| Source: |
http://esbd.cpa.state.tx.us/bid_show.cfm?bidid=76341 |
Posted Date: |
Apr 29, 2008 |
| Due Date: |
May 20, 2008 |
|
| Description |
 |
| CONSTRUCTION OF GALVESTON ISLAND SEAWALL HANDICAP ACCESS RAMP GALVESTON, TEXAS |
| Open Date: 05/20/08 03:00 PM
| Agency Requisition Number: 81469-HR
|
|
NOTE: You will need to download all of the
following files for
specifications and other required document, including a HUB subcontracting plan(if required).
Help: Right Click to and choose
"save file as" or "save target as" to your computer.
-Package 1 size: 241844 (in bytes)
Type:
Specification
Format:
Acrobat PDF Files
-Package 2 size: 3115893 (in bytes)
Type:
Specification
Format:
(Compressed File)
-Package 3 size: 3935801 (in bytes)
Type:
Specification
Format:
(Compressed File)
-Package 4 size: 3181439 (in bytes)
Type:
Specification
Format:
(Compressed File)
-Package 5 size: 2886603 (in bytes)
Type:
Specification
Format:
(Compressed File)
-Package 6 size: 2908634 (in bytes)
Type:
Specification
Format:
(Compressed File)
-Package 7 size: 5197160 (in bytes)
Type:
Specification
Format:
(Compressed File)
|
| The Texas General Land Office (the € GLO € ) is currently seeking a highly
skilled contractor(s) to construct a Galveston Island Seawall Handicap
Access Ramp (the € Project € ). The Project is for the purpose of
providing a handicap accessible path from the seawall near 57th Street
to the beach. The Work involves constructing an approximate 120 linear
feet of ramp, foundations for ramp, handrails, and walkway grating and
approximately 30 linear feet of walk-able beach matting, as well as
protection of the environment, erosion control, construction surveying,
and clean up. The work will occur during a time period defined by the
U.S. Fish & Wildlife Service (the € USFWS € ) as a turtle nesting period
for five sea turtle species defined as either threatened or
endangered. Turtle nesting period for the beach has been identified by
the federal regulatory agencies to occur between March 15 and September
30, with peak nesting occurring between April 1 and September 1. This
project requires the Contractor to implement a Turtle Monitoring Plan
as specified in the Project Manual. Work must be implemented in a
manner to follow all applicable laws and regulations set forth by the
local, state, and federal regulatory agencies having jurisdiction over
the project. The GLO anticipates that construction will take
approximately 45 calendar days and construction must be completed no
later than July 31, 2008 due to the Project € s funding. |
|
| Agency: GENERAL LAND OFFICE (305)
| | |
| Previous Price Paid:
N/A
|
| Solicitation type:
Emergency (Less than 14 days)
|
NIGP Commodity Code(s):
| Contact Information: |
| Contact Name: | Helen Ringer |
| Email: | helen.ringer@glo.state.tx.us |
| Address: | 1700 North Congress Avenue |
| | Stephen F. Austin Building, Room 951A |
| | Austin, TX 78701-1495 |
| Phone: | (512) 463-5246 |
| Fax: | (512) 463-1795 |
Upload Date: 2008-04-29 14:00:46.9 Updated date: 2008-04-29 14:01:09.29
|
|