Government contract and bid
About Us Sitemap Help Sign In
Southwest Quadrant Area Phase II Construction Projects Division I, 2 & 3 / 08-235
Program Summary
Title: Southwest Quadrant Area Phase II Construction Projects Division I, 2 & 3 / 08-235
GovCB Opps ID : ADP12209184260000462
FSC Code: y - Construction of Structures and Facilities
Solicitation No.: 08-235
Source: http://www.ci.savannah.ga.us/purchasing/webbids.nsf/8882dbdb9fa692498525697400733def/1fd...
Posted Date:
Sep 08, 2008
Due Date: Oct 07, 2008

Description
Southwest Quadrant Area Phase II Construction Projects Division I, 2 & 3 / 08-235

This BID is currently Open as of 09/08/2008
All Bids/Proposals are to be received by the Purchasing Department no later than 10/07/2008 at 01:30 PM
If you have questions concerning the City's bid process, please contact: Joy Kerkhoff at 912-651-6422.
For technical questions related to this specific Bid or RFP, please contact: DASLIN GARCON at 651-6573

Description :Bids will be accepted from pre-qualified bidders only. Those bidders are:

Cleland Site Prep
TB Landmark Construction
D & R Utility Construction
Triad Engineering
Terry R. Lee Contracting
Strack Inc.
Kemi Construction
S.J. Louis Construction
Anson Construction
TIC The Industrial Company
RB Baker Construction
Reynolds, Inc.
Southern Champion Construction
Ruby Collins
Garney Construction
Winter Construction
W.L. Hailey & Company
BRW Construction
Kiewit Southern Company
Garys Grading & Pipeline
RH Moore Co.

Sealed proposals will be received from pre-qualified contractors only until 1:30 PM on Tuesday, October 7, 2008. The names of the respondents will be read aloud at 1:30 PM of the same day and no further bids will be accepted. The Minority Employment Provisions will be evaluated and those bids found to be in compliance with the Minority Employment Provisions shall be opened and read aloud at 1:30 PM on Tuesday, October 14, 2008.

Bidders Bidders will be permitted to submit Bids for any of the individual Projects or combinations of Projects listed below.

DIVISION 1 - PUMP STATION CONSTRUCTION: Includes furnishing and installing all pumps, painting, piping, valves, ventilations, electrical equipment, starters, switchgear, motor control centers, power and control conduit and wiring, lighting systems, stand-by-power generator(s), wiring of electrical panels, instrumentation, clearing and grubbing, earthwork, access road, concrete and masonry, cranes, and systems required for the pump stations including the Master Pump Station, Mega-Site Pump Station, Regional Pump Station, and all associated appurtenances as described in these Specifications and shown on the Drawings.

DIVISION 2 - OFF-SITE SANITARY SEWER CONSTRUCTION: Includes furnishing and installing approximately 45,300 feet of 16-inch force main, 6,600 feet of 8 through 36-inch interceptor, 1,200 feet of 8 waterline, clearing and grubbing, traffic control, surface restoration, valve assemblies, air/vacuum valve assemblies, bored and jacked highway crossings, horizontal direction drilling, manholes, and all associated appurtenances as described in these Specifications and shown on the Drawings.

DIVISION 3 - PUMP STATION CONSTRUCTION AND THE OFF-SITE SANITARY SEWER CONSTRUCTION COMBINED: Includes furnishing and installing all pumps, painting, piping, valves, ventilations, electrical equipment, starters, switchgear, motor control centers, power and control conduit and wiring, lighting systems, stand-by-power generator(s), wiring of electrical panels, instrumentation, clearing and grubbing, earthwork, access road, concrete and masonry, cranes, and systems required for the pump stations including the Master Pump Station, Mega-Site Pump Station, Regional Pump Station, and all associated appurtenances as described in these Specifications and shown on the Drawings. Also includes furnishing and installing approximately 45,300 feet of 16-inch ductile iron force main, 6,600 feet of 8 through 36-inch interceptor, 1,200 feet of 8 waterline, clearing and grubbing, traffic control, surface restoration, valve assemblies, air/vacuum valve assemblies, bored and jacked highway crossings, horizontal direction drilling, manholes, and all associated appurtenances as described in these Specifications and shown on the Drawings.

The MWBE goal for this project:
Div 1 - Pump Station Construction: 11.0 %, 8.0 % minority and 3.0 % women
Div 2 - Off-Site Sanitary Sewer Construction: 11.0 %, 8.0 % minority and 3.0 % women
Div 3 - Pump Station Construction and the Off-Site Sanitary Sewer Construction Combined: 11.0 %, 8.0 % minority and 3.0 % women
Commodity Codes :SW Quad Area Phase II Cosntruction 978

Pre-Bid Conference :Yes / Not Mandatory
Date / Time :09/17/2008 at 10:00 AM
Conference to be held at :Metropolitan Planning Commission Offices, 112 E State St
Arthur C. Medonsa Hearing Room,

Plans Available :YesFile File
Click Here to Download a Request Form Clayton Digital Reprographics
1000 Eisenhower Dr.
Savannah, GA 31406
Phone: (912) 352-3880
Plans Available For Viewing Only At :Savannah Entrepreneurial Center
801 E. Gwinnett Street
Phone: 912-652-3582 or 912-651-3653

The following Vendors have requested the Plans :
CompanyContactPhone
BRW CONSTRUCTION GROUP, LLCRhonda Johnson912-236-8107
Consolidated Pipe & Supply Co. Inc.Brandon Ledbetter912-964-4333
D & R UTILITY CONSTRUCTION DONNIE TYSON 912-236-7669

File File File File
Bid / RFP Attachment(s) :
File
The PDF (portable document format) files listed are available for viewing online using the Adobe Acrobat Reader 3.0 (or later) file viewer. If you do not already have the Adobe Acrobat Reader installed on your system, you must download and install the software prior to viewing the document online. Click here to obtain a free copy from Adobe Systems, Inc.

Addenda :
No addenda issued as of this date.





Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved