The project is for replacing the existing gaseous chlorine disinfection system, and gaseous sulfur dioxide dechlorination system, with sodium hypochlorite and sodium bisulfite. The project involves construction of a tank farm for hypochlorite, 330,000 gallon FRP tanks and a bisulfite 4-12,000 gallon HDPE tanks on concrete pile foundation, transfer stations, metering pumps, associated piping and valves, electrical and instrumentation works. NEW Posted on 2-13-08 Download Addendum 2 (PDF, 2.6 MB) Download Attachment A - Drawings (PDF, 3.6 MB) Download Attachment B - Specifications (PDF, 89 KB) Download Attachment C - Special Provisions (PDF, 54 KB) Download Attachment D - List of Subcontractors (PDF, 17 KB) Posted on 1-29-08 Download Addendum 1 (PDF, 395 KB) Posted on 12-19-07 Download the Notice to Contractors (PDF, 68 KB) |