Government contract and bid
About Us Sitemap Help Sign In
RECOVERY--Z--Repair of the HVAC system for Dorm Quad Building 2516 to Building 2519, Edwards, AFB, CA.
Program Summary
Title: RECOVERY--Z--Repair of the HVAC system for Dorm Quad Building 2516 to Building 2519, Edwards, AFB, CA.
GovCB Opps ID : ADP12457815250001193
Document Type: U.S. Army Corps of Engineers U.S. Army Corps...
FSC Code:
Set Aside: N/A
Source: https://www.fbo.gov/?s=opportunity&mode=form&id=523125064b7b82ed4c5035969a5b8c2f&tab=cor...
Place of
Performance:

Posted Date:
Jun 23, 2009
Last Update: Jun 23, 2009
Due Date: Jun 22, 2009

Description
Solicitation Number:
W912PL-09-D-0030-0001
Notice Type:
Presolicitation
Synopsis:
Added: Jun 23, 2009 1:13 am
RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W912PL-09-D-0030-0001.

Pojoaque Pueblo Services Corp., Edwards, CA. This is not a solicitation. The Los Angeles District, U.S. Army Corps of Engineers has a requirement to Repair of the HVAC system for Dorm Quad Building 2516 to Building 2519, Edwards, AFB, CA.
It is the intent of the Government to award a task order on an existing Performance Oriented Construction Activity (POCA). The task order is firm fixed price.
The Los Angeles District, U.S. Army Corps of Engineers proposed to issue a new POCA contract and a new task order for the Repair of the HVAC system for Dorm Quad Building 2516 to Building 2519.
1. The HVAC System shall be properly met and sized to properly condition the building in accordance with the latest industry standards including CA T-24. Cooling systems based on ASHRAE 1% design day. For Edwards AFB this will be 103 deg F dry bulb outside air Temperature with a 68 degree F mean coincidental wet bulb. Heating systems based on ASHRAE .6% design dry bulb of 37 degrees F. Indoor design conditions will be 75 degrees F cooling space temperature and 68 degrees F heating space temperature.
2. Furnish and install a 4-pipe underground hydronic water distribution system for the eight (8) dorm building in the housing complex. Sizing and route of piping distribution to be determined by the Air Force.
3. Remove refrigerant form the existing dormitory A/C systems using government furnished containers, and return to the 95 AWB/CETA HVAC shop. Provide an inventory of the amount of refrigerant recovered.
4. Demolish the following equipment form each building: hot water storage tank, boiler, pumps, and hot water pipe on the mechanical room sufficient to allow connection to the domestic hot water pipe.
5. Furnish new indoor 4-pipe (hot water heating/chilled water cooling) fan coil units (design phase of the project will determine exact selection). Storage room will have heating only fan coil units.
6. Furnish and install a 4-pipe hydonic system for the dorm buildings.
7. Furnish and install a total of six (6) American Standard D-80-512 domestic hot water heater/boilers throughout the dormitory mechanical rooms as directed by EAFB.
8. Insulate all new mechanical piping as needed.
9. Patching of stucco or drywall.
10. Flush chilled and hot water loops with clean water; clean strainers through-out the system.


Contracting Office Address:
US Army Corps Of Engineers, Los Angeles, P.O. Box 532711, Los Angeles, CA 90053-2325
Place of Performance:
US Army Corps Of Engineers, Los Angeles P.O. Box 532711, Los Angeles CA
90053-2325
US
Point of Contact(s):
Maricela Zamora, 213-452-3250

US Army Corps Of Engineers, Los Angeles




Home - Browse By Keyword - Browse By Region - About Us - Sitemap - Help - contact Us - Privacy Policy - Terms of Use
Copyright 2004 GovCB.com All rights reserved