Government contract and bid
About Us Sitemap Help Sign In
NFSR #472, South Toe River Road Bridge Construction and Removal of a Concrete Vented Ford Structure.
Program Summary
Title: NFSR #472, South Toe River Road Bridge Construction and Removal of a Concrete Vented Ford Structure.
GovCB Opps ID : ADP12187342250000672
Document Type: Solicitation / Cancelled
FSC Code: Y - Construction of Structures and Facilities
Set Aside: Total HUB-Zone
Solicitation No.: AG-4568-S-08-0047
Source: https://www.fbo.gov/?s=opportunity&mode=form&id=58fced46924a1f34bb2b86bf0c895d19&tab=cor...
Place of
Performance:

Posted Date:
Aug 14, 2008
Last Update: Aug 14, 2008
Due Date: Aug 06, 2008

Description
NFSR #472, South Toe River Road Bridge Construction and Removal of a Concrete Vented Ford Structure.
Solicitation Number: AG-4568-S-08-0047
Agency: Department of Agriculture
Office: Forest Service
Location: R-8/SRS Eastern Administrative Zone
  • Print
  • Link
    Copy or Bookmark this Page

    Copy the url below for a direct link to this page.

    Bookmark this page by right-clicking here and choosing "Bookmark This Link..."

Opportunity History
Solicitation Number:
AG-4568-S-08-0047
Notice Type:
Solicitation / Cancelled
Synopsis:
Added: Jun 19, 2008 10:44 am
TOTAL HUBZONE SETASIDE. This project includes, but is not limited to, construction surveying, clearing and grubbing, diverting small stream flow, soil erosion and sediment control, temporary traffic control, installation of a new, poured-in-place road bridge, removal of a concrete vented ford, streambed restoration, small road restoration area, and placing aggregate base course to transition to the existing roadway. The Federal Highway Administration Standard Specification for Construction of Roads and bridges on Federal Projects (FP-03) supplemented by special project specifications will govern this requirement. The period of performance for this project is 300 calendar days from the Notice to Proceed date, which includes a six-month period where no work can occur within 25 of the high-water level between October 15 and April 15. The magnitude of construction is between $250,000 and $500,000. The project is located on the Appalachian Ranger District in Yancey County, North Carolina. A pre-bid meeting will be held on July 22, 2008 at 1:00 pm sharp, EDT at the project site. Directions to the pre-bid are to take US 19E from Burnsville, NC to Micaville. Turn Right on State Road 80 and travel approximately 9.5 miles to the Mount Mitchell Golf Course. Turn right and travel about 5 miles past the Black Mountain Campground to the Ford Site. You may contact the District office at (828) 682-6146 for more detailed directions if necessary. It is STRONGLY ENGOURAGED that all prospective bidders attend this meeting. All documents will be uploaded to this site on or about July 3, 2008. You should register to receive notification found on this website after which you will receive an eMail notifying you that the documents have been uploaded. BID DUE DATE: August 6, 2008 at 2:00 pm EDT. Again, this project is set-aside for HUBZONE contractors only. HUBZONE certification must have been received not later than the time proposals are due.
Added: Aug 14, 2008 1:03 pm
Due to unforseen fire funds borrowing, it is necessary to cancel the South Toe River Bridge solicitation in its entirety. Should funding be received in the future to build this bridge, a new presolicitation notice will be posted. Thank you for your interest and I apolgize for any inconvenience this may have caused you.
Please consult the list of document viewers if you cannot open a file.
Solicitation 1
Sensitive/Secure Package:
no
Type:
Solicitation
Posted Date:
July 8, 2008
Description: South Toe River Bridge RFP
Description: South Toe River Bridge Supplemental Specifications
Description: South Toe River Bridge Wage Rates
Description: South Toe River Bridge Experience Questionnaire
Description: South Toe River Bridge Plans Cover Page
Description: South Toe River Bridge Plans Sheet S1
Description: South Toe River Bridge Plans Sheet S2
Description: South Toe River Bridge Plans Sheet S3
Description: South Toe River Bridge Plans Sheet C1
Description: South Toe River Bridge Plans Sheet C2
Description: South Toe River Bridge Return Package
Amendment 1
Sensitive/Secure Package:
no
Type:
Mod/Amendment
Posted Date:
August 4, 2008
Description: Amendment One
Contracting Office Address:
200 WT Weaver Blvd.
Asheville, North Carolina 28804
Place of Performance:
Appalachian Ranger District

Yancey COunty, North Carolina 28755
United States
Primary Point of Contact.:
Don Bailey,
Contracting Officer
Phone: (828) 257-4205
Fax: (828) 257-4876
General Information
Notice Type:
Solicitation / Cancelled
Original Posted Date:
June 19, 2008
Posted Date:
August 14, 2008
Response Date:
August 6, 2008
Original Response Date:
August 6, 2008
Archiving Policy:
Automatic, on specified date
Original Archive Date:
August 18, 2008
Archive Date:
August 18, 2008
Original Set Aside:
Total HUB-Zone
Set Aside:
Total HUB-Zone
Classification Code:
Y -- Construction of structures and facilities
NAICS Code:
237 -- Heavy and Civil Engineering Construction/237310 -- Highway, Street, and Bridge Construction




Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved