Opportunity History
- Complete View
- Original Synopsis
Presolicitation Jun 23, 2008 7:00 pm - Changed
Jul 18, 2008 7:10 pm Solicitation - Changed
Aug 04, 2008 5:13 pm - Changed
Aug 04, 2008 5:20 pm - Changed
Aug 07, 2008 12:21 pm - Changed
Aug 07, 2008 2:06 pm - Changed
Aug 08, 2008 4:33 pm - Changed
Aug 08, 2008 5:16 pm - Changed
Aug 09, 2008 11:56 am - Changed
Aug 11, 2008 11:17 am - Changed
Aug 11, 2008 6:58 pm - Changed
Aug 12, 2008 11:43 am - Changed
Aug 12, 2008 12:05 pm
|
Solicitation Number:
FA6656-08-R-0004
Notice Type:
Solicitation
Synopsis:
Added: Jun 23, 2008 9:07 am
THIS SOLICITATION IS BEING OFFERED AS A TOTAL SERVICE DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE. The project involves the contractor providing all labor, materials, tools, equipment, permits, and transportation necessary to construct modify the industrial wastewater pretreatment (IWP) system to include process monitoring and additional control response levels, installing metering units at various stages and at discharge points, constructing an addition for material handling and process equipment, installing a sample testing laboratory unit, upgrading the electronic monitoring and control system, and installing a fire suppression system on Youngstown Air Reserve Station at Vienna Ohio. Construction includes mechanical, structural, electrical and piping activity. The magnitude of this project is between $500,000 and $1,000,000. This project is located at the 910 Airlift Wing (AFRC), Youngstown Air Reserve Station, 3976 King Graves Rd, Vienna OH 44473-5931 (Trumbull County). This is a Request for Proposal (RFP), Price Performance Tradeoff (PPTO) solicitation. There will be no public bid opening. The closing date for submission of offers is estimated to be ON OR ABOUT 8 Aug 08 and will be contained in the solicitation package. Award will be made based upon the Best Value to the Government in accordance with FAR 15. Total contract performance period is 210 calendar days from date of receipt of the notice to proceed. The resultant award will be a Firm-Fixed Price contract. The NAICS Code is 236210, and the Size Standard is $31 million average annual receipts over the past three years. Paper copies of the solicitation will not be provided as these documents, which include the solicitation, drawings, and specifications, can be downloaded from the FedBizOpps (FBO) at http://www.fbo.gov and should be available ON OR AFTER 8 July 2008. Once the solicitation is posted, it is incumbent upon the interested parties to review this site frequently for any updates/amendments to any and all documents. The following viewers can be used to view the solicitation: Microsoft Word (.doc), Adobe Acrobat Reader (.pdf), WinZip (.zip or .exe), Bidview (.cal) and Max View/Source View (.exe). More information concerning these viewers can be found at www.fbo.gov. To be included on the Potential Prime, Subcontractor, and/or Supplier List, interested parties should identify themselves by adding their data to the Interested Vendors List (IVL) on the FBO site below the solicitation. Contractors are also requested to identify if they have other designated size standards besides Service Disabled Veteran (i.e. Small, Woman Owned, 8(a), HUBZone, etc.). Contractors are advised that in order to receive an award as the prime contractor, they must be listed in the Central Contractor Register (CCR) database; failure to register will disqualify a contractor from award should the contractor be selected and not registered. Contractors may register via the Internet CCR website at http://www.ccr.gov . Registration may take up to three weeks to process. Recommend registering immediately in order to be eligible for timely award. Contractors are also advised that they must be registered with the Online Representations and Certifications Application (ORCA), and have completed electronic annual representations and certifications at http://orca.bpn.gov, or risk having their proposals declared non-responsive. ORCA replaces most paper-based certifications and representations previously found in Section K of contractor proposals. Site visit information will be provided in the bid package; prime contractors, subcontractors and/or suppliers may attend the site visit. All responsible sources may submit a proposal, which shall be considered by the Air Force Reserves. The response date cited above is an estimate, not an actual. This notice does not obligate the government to award a contract nor does it obligate the government to pay for any bid/proposal preparation costs.
Solicitation 1
Sensitive/Secure Package:
no
Posted Date:
July 18, 2008
Description: FA6656-08-R-0004 Solicitation (SF1442 - Sections A through M)
Description: FA6656-08-R-0004, Atch 1, General Decision - Modification 6
Description: FA6656-08-R-0004, Atch 4, Past Performance Questionnaire
Description: FA6656-08-R-0004, Atch 2, Specifications
Description: Drawing G1 Title Page, Sheet 1 of 27
Description: Drawing C1-Demo Plan, sheet 2 of 27
Description: PDF Drawing C2 Site & Utility Plan, sheet 3 of 27
Description: PDF Drawing C3 Grading Plan, Sheet 4 of 27
Description: PDF Drawing C4 Details, Sheet 5 of 27
Description: PDF Drawing A1 Flr, Roof & Reflected Ceiling, Sheet 6 of 27
Description: PDF Drawing A2 Exterior & Interior Elevation, Sheet 7 of 27
Description: PDF Drawing A3 Sections and Details, Sheet 8 of 27
Description: PDF Drawing A4 Schedules and Details Sheet 9 of 27
Description: PDF Drawing S1 Foundation Plan & Detail Sheet 10 of 27
Description: PDF Drawing S2 Roof Framing Plan & Detail Sheet 11 of 27
Description: PDF Drawing S3 Foundation Section & Detail Sheet 12 of 27
Description: PDF Drawing S4 Frame Sections and Detail Sheet 13 of 27
Description: PDF Drawing P1 Plumbing Plan Sheet 14 of 27
Description: PDF DrawingM1 Mechanical Plan Sheet 15 of 27
Description: PDF Drawing M2 P & I Diagram Sheet 16 of 27
Description: PDF Drawing M3 Carbon Tank Repair Sheet 17 of 27
Description: PDF Drawing M4 Deicing Manhole Site Plan Sheet 18 of 27
Description: PDF Drawing M5 Deicing Collection Sys Detail Sheet 19 of 27
Description: PDF Drawing M6 Fire Training Deicing Manhole Sheet 20 of 27
Description: PDF Drawing M7 flow Sensor-Monitor Mod Sheet 21 of 27
Description: PDF FP1 Fire Protection Plan Sheet 22 of 27
Description: PDF Drawing E1 Electrical Legend, Fixture... Sheet 23 of 27
Description: PDF Drawing E2 Electrical Power & Lighing Sheet 24 of 27
Description: PDF Drawing E3 Fire Detection Plan Sheet 25 of 27
Description: PDF Drawing E4 Electrical Site Plan-B309 Sheet 26 of 27
Description: PDF Drawing E4 Electrical Site Plan-Fire Training Facility Sheet 27 of 27
Description: Silt Fence Detail -001
Description: Silt Fence Detail - 002
Amendment 1
Sensitive/Secure Package:
no
Posted Date:
August 4, 2008
Description: Amendment Correcting Day of Site Visit and Attachment Number of Performance Questionnaire.
Site Visit Info - Responses to Contractor Questions.
Sensitive/Secure Package:
no
Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Site Visit Info - Responses to Contractor Questions.
Posted Date:
August 4, 2008
Description: SITE VISIT INFORMATION
Description: RESPONSES TO CONTRACTOR QUESTIONS AS OF 4 AUG 08
Responses to Contractor Questions as of 7 Aug 08
Sensitive/Secure Package:
no
Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Responses to Contractor Questions as of 7 Aug 08
Posted Date:
August 7, 2008
Description: Responses to Contractor Questions as of 7 Aug 08
Minutes to Site Visit Held 6 Aug 08
Sensitive/Secure Package:
no
Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Minutes to Site Visit Held 6 Aug 08
Posted Date:
August 7, 2008
Description: Minutes to Site Visit Held 6 Aug 08; List of Contractor Attendees
Amendment 2
Sensitive/Secure Package:
no
Posted Date:
August 8, 2008
Description: FA6656-08-R0004, Amendment 0002
Description: FA6656-08-R0004, Amd 0002, Atch 1 - Adds Financial Institution Reference Sheet (Atch 5 to Solicitation)
Description: FA6656-08-R0004, Amd 0002, Atch 2, Sheet 1 of 2 - Revised DWG E-2 - Electrical Power and Lighting Plan
Description: FA6656-08-R0004, Amd 0002, Atch 2, Sheet 2 of 2 - Revised DWG E-4 - Electrical Site Plan, Bldg 309.
Responses to Questions Raised During Site Visit Held 6 Aug 08
Sensitive/Secure Package:
no
Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Responses to Questions Raised During Site Visit Held 6 Aug 08
Posted Date:
August 8, 2008
Description: Responses to Questions Raised During Site Visit Held 6 Aug 08
List of Potential Primes, Subcontractors, Suppliers
Sensitive/Secure Package:
no
Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
List of Potential Primes, Subcontractors, Suppliers
Posted Date:
August 9, 2008
Description: Lost of Potential Prime, Subcontractor, Suppliers as of 8 Aug 08. (Four Pages)
Amendment 3
Sensitive/Secure Package:
no
Posted Date:
August 11, 2008
Description: Amendment 0003 to Solicitation FA6656-08-R-0004, Correcting Magnitude of Construction.
Response to Contractor Question
Sensitive/Secure Package:
no
Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Response to Contractor Question
Posted Date:
August 12, 2008
Description: Response to Contractor Question in Regard to HMI Screen
Updated List of Potential Subcontractors
Sensitive/Secure Package:
no
Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Updated List of Potential Subcontractors
Posted Date:
August 12, 2008
Description: Updated List of Potential Primes, Subcontractors, Suppliers as of 12 Aug 08
Contracting Office Address:
3976 King Graves Road
Unit 31
Youngstown ARS,
Ohio
44473-5931
Place of Performance:
YOUNGSTOWN AIR RESERVE STATION, 3976 KING GRAVES ROAD
VIENNA,
Ohio
44473-5931
United States
Primary Point of Contact.:
Helen L Jordan,
Contracting Officer
Phone: 330-609-1306 Fax: 330-609-1042
Secondary Point of Contact:
Susan Weaver,
Contracting Officer
Phone: 330-609-1212 Fax: 330-609-1042
|
All Files
- Solicitation 1
Jul 18, 2008 FA6656-08-R0004.docFA6656-08-R0004, Atch 1 Gen Dec Mod 6.docAttachment 4 - PastPerformanceQuestionnaire.docFA6656-08-R0004, Atch 2 Specifications.doc1 of 27-G1, Title Page.pdf2 of 27-C1, Demo Plan.pdf3 of 27-C2, Site & Utility Plan.pdf4 of 27-C3, Grading Plan.pdf5 of 27-C4, Details.pdf6 of 27-A1, Flr, Roof & Reflected Ceiling Plans.pdf7 of 27-A2, Exterior & Interior Elevations.pdf8 of 27-A3, Sections and Details.pdf9 of 27-A4, Schedules and Details.pdf10 of 27-S1, Foundation Plan & Detail.pdf11 of 27-S2, Roof Framing Plan & Details.pdf12 of 27-S3, Foundation Section & Detail.pdf13 of 27-S4, Frame Sections and Details.pdf14 of 27-P1, Plumbing Plan.pdf15 of 27-M1, Mechanical Plan.pdf16 of 27-M2, P & I Diagram.pdf17 of 27-M3, Carbon Tank Repair &Coating; Details.pdf18 of 27-M4, Deicing Manhole Site Plan.pdf19 of 27-M5, Deicing Collection Sys Details.pdf20 of 27-M6, Fire Training Deicing Manhole Site Plan.pdf21 of 27-M7, Flow Sensor-Monitor Modification.pdf22 of 27-FP1, Fire Prot Plan.pdf23 of 27-E1, Electrical Legend, Fixture Sch & one Line Diagram.pdf24 of 27-E2, Electrical Power & Lighting Plan.pdf25 of 27-E3, Fire Det Plan.pdf26 of 27-E4, Electrical Site Plan-B309.pdf27 of 27-E5, Elec Site Plan-Fire Training Facility.pdfsilt fence-001.tifsilt fence-002.tif- Amendment 1
Aug 04, 2008 FA6656-08-R0004, Amd 0001.doc- Site Visit Info - Responses to Contractor Questions.
Aug 04, 2008 SITEVISITINFOPOSTING.docRESPONSES TO CONTRACTOR QUESTIONS AS OF 4 AUG 08.docx- Responses to Contractor Questions as of 7 Aug 08
Aug 07, 2008 RESPONSES TO CONTRACTOR QUESTIONS AS OF 7AUG 08.doc- Minutes to Site Visit Held 6 Aug 08
Aug 07, 2008 site visit minutes.doc- Amendment 2
Aug 08, 2008 FA6656-08-R0004, Amd 0002.docFA6656-08-R0004, Amd 0002, Atch 1 - Responsibility Questionnaire.doc24 of 27-E2 Rev Electrical Power Lighting Plan-Paper.pdf26 of 27-E4 Rev Electrical Site Plan B-309-Paper.pdf- Responses to Questions Raised During Site Visit Held 6 Aug 08
Aug 08, 2008 RESPONSES TO CONTRACTOR QUESTIONS-Site Visit.docx- List of Potential Primes, Subcontractors, Suppliers
Aug 09, 2008 FA6656-08-R0004Prime,SubsList- 8Aug 08.rtf- Amendment 3
Aug 11, 2008 FA6656-08-R0004, Amd 0003.doc- Response to Contractor Question
Aug 12, 2008 RESPONSE TO CONTRACTOR QUESTION-HMI SCREENS.docx- Updated List of Potential Subcontractors
Aug 12, 2008 FA6656-08-R0004Prime,SubsList- 12Aug 08.rtf
General Information
Notice Type:
Solicitation
Original Posted Date:
June 23, 2008
Posted Date:
August 12, 2008
Response Date:
Aug 18, 2008 2:00 pm
Original Response Date:
-
Archiving Policy:
Manual Archive
Original Set Aside:
Service-Disabled Veteran-Owned
Set Aside:
Service-Disabled Veteran-Owned
Classification Code:
Z -- Maintenance, repair, and alteration of real property
NAICS Code:
236 -- Construction of Buildings/236210 -- Industrial Building Construction
|