DESCRIPTION OF WORK
Work consists of removing 1 existing 48 round pipe and furnishing and installing a maodular design single lane standard 25 reinforced concrete bridge.
Associated work includes mobilization, soil stabilization, construction of road approaches to the bridge, concrete foundation, placement of borrow material and crushed aggregate rock.
Streambed simulation material shall be placed under the new bridge and for approximately 100 feet if stream channel, then shaped to simulate a natural channel. Stringent erosion and sediment control measures will be required.
The roadway will be reestablished to the existing horizontal alignment and aggregate surfacing replaced. All disturbed areas will be seeded and mulched.
This project will be posted to FedBizOpps as a pre-solicitation notice on July 23, 2008. The project will upload in FedBizOpps as a solicitation on or around August 7, 2008, and bids will be due at the Malheur National Forest office COB on September 8, 2008. This project is estimated between $25,000 and $100,000.
This project is 100% Small Business set aside. For a copy of this solicitation, please contact Lucie Immoos at 541-575-3312.