Added: Sep 06, 2008 11:58 am
Modified: Sep 19, 2008 11:12 am
Track Changes
REFERENCE PAGE 1, BLOCK 8, CHANGE FROM: 09-15-2008 TO READ: 09-26-2008
REFERENCE PAGE(S) 5 - 7, SCOPE OF WORK, REPALACE WITH REVISED SCOPE OF WORK DATED 9/17/08
HIGH-LOW BOILERS REVISED 9/17/08
THE FOLLOWING SCOPE OF WORK FOR ACCIDENT INSPECTIONS FOR THE HIGH & LOW
BOILERS LOCATED BLDGS.# 22 & 70 PLANT ARE AS FOLLWS RE: 518-09-1-4829-0016
SERVICE CONTRACT: MAINTENANCE
SERVICE AGREEMENT FOR INSPECTIONS FOR
PERIOD 10-01-08 TO 9/30/09 FOR
INSPECTIONS OF HIGH AND LOW PRESSURE
BOILERS AT BLDG.# 70 AND BLDG.# 22.
REFER TO ATTACHED/SUBMITTED SCOPE OF WORK
VENDOR WILL NEED TO PICK UP A VISTOR
BADGE AND PARKING PERMIT AT THE VA
POLICE STATION IN BUILDING 78 ROOM
B14I.
VENDOR WILL BE REQUIRED TO CHECK IN AT
BUILDING 80 ROOM 110 DURING NORMAL
TOUR OF DUTY AND WITH THE DUTY
ENGINEER (USRO) DURING OFF TOUR
WITHOUT EXCEPTION.
VENDOR HAS TO MEET ALL REQUIREMENTS OF
OSHA 10 HOURS SAFETY COURSE.
A. SERVICE:
1. TO PROVIDE LABOR, MATERIALS,
TOOLS, TRAVEL AND SUPERVISION TO
PERFORM INTERNAL/EXTERNAL OPERATIONAL
INSPECTIONS FOR TWO CLEAVER BROOKS 700
HP HIGH PSI BOILERS, (DELETION) **** A THIRD CLEAVER BROOKS BOILER WILL BE ADDED FOR INSPECTION ON 10-01-09.
AND ONE HB SMITH
SECTIONAL TYPE LOW PSI
BOILERS. HIGH PSI BOILERS ARE LOCATED
IN BUILDING 22 AND LOW PSI BOILERS ARE
LOCATED IN BUILDING 70.
2. INSPECTION WILL INCLUDE FURNANCE
AND OTHER INTERNAL SURFACES, CLOSURES
AND ACCESSORIES. INSPECT EXTERIOR OF
UNIT, CASING, SUPPORT, CLOSURES,
ACCESSORIES, VALVES, AND CONTROLS.
3. INSPECT DEAERATOR AND WET MAGNETIC
PARTICLE TESTING OF WALLS OF PRESSURE
VESSEL INTERIOR. THIS IS A ONE TIME
SERVICE. VENDOR WILL INVOICE AFTER
COMPLETION OF PROVENT AND PROVIDE THE
VA MEDICAL CENTER WITH A FULL DETAIL
REPORT OF THE RESULTS ACCORDING TO
A.S.M.E. AND NATIONAL BOARD.
4. INSPECT BOILER FOULING AND
COMBUSTION GAS FLOW.
5. INSPECT FOR TUBE LEAK TEST.
6. INSPECT DRUMS, WELDS, THICKNESS OF
SHELL FOR CORROSION.
7. INSPECT FOR SCALE OR CORROSION IN
DRUMS, SHELLS, OR TUBES.
B. INSPECT BOILER ECONOMISER ON
BOILER #1 AND #2.
C. SPECIFICATIONS:
1. THERE WILL BE THREE INTERNAL & EXTERNAL
INSPECTIONS PER YEAR.
2. THIS WILL ALSO INCLUDE THE
INTERNAL INSPECTION OF (DELETION) OF DA TANK ONCE EVERY 6 YEARS. NEXT TEST DUE MAY 2013.
3. BOILER INSPECTIONS WILL BE DONE
DURING BUSINESS HOURS (8-4, M-F). (DELETION)
MUST BE PRESCHEDULED WITH THE C.O.T.R.
ALL WORK MUST BE PERFORMED BY BOARD
CERTIFIED INSPECTOR. (NATIONAL BOARD
OF BOILER INSPECTORS) (NBBI)AND IN
COMPLIANCE ASME STANDARDS.