Government contract and bid
About Us Sitemap Help Sign In
Greenbelt Rail Vehicle Lift Systems
Program Summary
Title: Greenbelt Rail Vehicle Lift Systems
GovCB Opps ID : ADP12126240500000970
Document Type: Combined Synopsis/Solicitation (Modified)
FSC Code: 22 - Railway Equipment
Set Aside: Total Small Disadvantage Business
Solicitation No.: RFP-FN8041_NAC
Source: https://www.fbo.gov/?s=opportunity&mode=form&id=5a38990d8f0a77d16a0fe12b0669f17b&tab=cor...
Place of
Performance:

Posted Date:
Jun 04, 2008
Last Update: Jun 28, 2008
Due Date: Jun 26, 2008

Description
Greenbelt Rail Vehicle Lift Systems
Solicitation Number: RFP-FN8041_NAC
Agency: Washington Metropolitan Area Transit Authority
Office: Procurement and Materiels
Location: PRMT-JGB
  • Print
  • Link
    Copy or Bookmark this Page

    Copy the url below for a direct link to this page.

    Bookmark this page by right-clicking here and choosing "Bookmark This Link..."

Opportunity History
Solicitation Number:
RFP-FN8041_NAC
Notice Type:
Combined Synopsis/Solicitation
Synopsis:
Added: May 29, 2008 4:12 pm Modified: Jun 04, 2008 3:55 pmTrack Changes
RFP-FN8041/NAC
Contract No. FN8041
Greenbelt Rail Vehicle Lift Systems

Please note the following changes:
The Pre -Proposal Conference/Site Tour is re-scheduled for Tuesday June 17, 2008 at 9:00 am and the Proposals are now due on July 09, 2008.

The Washington Metropolitan Area Transit Authority requests your proposal to design, fabricate, install, test and commission eight (8) rail vehicle lift systems (Each system comprising of four hoists) at the Washington Metropolitan Area Transit Authority (WMATA) Greenbelt Yard located in Greenbelt, Maryland.

The rail vehicle lift systems shall be capable of safely lifting WMATA s married pair of rail vehicles on their wheels to the specified elevation above the shop floor to permit inspection, maintenance and repair activities on the rail vehicle. The rail vehicle lift systems shall be equipped with body stands that safely support the raised vehicle while the trucks are lowered for removal and replacement. The rail vehicle lift system shall be equipped with spinning posts that safely support the raised vehicle on its truck jacking pads while the traction motors are powered and the wheel sets are rotated.

Estimated cost range for this project is between $5M and $10M. Work to be completed within 510 Calendars Days after NTP. A Pre -Proposal Conference/Site Tour is scheduled for Tuesday June 17, 2008 at 9:00 am at the Greenbelt Yard construction trailer located at 5801 Sunnyside Avenue, College Park, MD 20740. Copies of the solicitation package will be available on or about Tuesday June 6, 2008 for a fee of $50.00 at WMATA s Plans Room located 900 Franklin Street, NE, Washington D.C. 20017; telephone (202) 269 4575, extension 231 or 246; fax (202) 635 6431. Proposals are due on July 9, 2008.

Questions should be directed to the Contract Administrator, Mr. Nichel Crooks, ncrooks@wmata.com, fax 202-962-2038, or (202) 962-1440.

Contracting Office Address:
600 5th Street
Washington, District of Columbia 20001
Place of Performance:
WMATA metrorail Greenbelt Yard
Greenbelt , Maryland
United States
Primary Point of Contact.:
Nichel S Crooks,
Contract Administrator
Phone: 202-962-1440
Fax: 202-962-2038
General Information
Notice Type:
Combined Synopsis/Solicitation
Original Posted Date:
May 29, 2008
Posted Date:
June 4, 2008
Response Date:
Jun 26, 2008 3:00 pm
Original Response Date:
Jun 26, 2008 3:00 pm Eastern
Archiving Policy:
Automatic, 15 days after response date
Original Archive Date:
July 11, 2008
Archive Date:
July 11, 2008
Original Set Aside:
Total Small Disadvantage Business
Set Aside:
Total Small Disadvantage Business
Classification Code:
22 -- Railway equipment
NAICS Code:
333 -- Machinery Manufacturing/333923 -- Overhead Traveling Crane, Hoist, and Monorail System Manufacturing




Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved