|
Opportunity History
|
Solicitation Number:
AG-82X9-S-08-0168
Notice Type:
Solicitation
Synopsis:
Added: Jun 24, 2008 4:18 pm
Modified: Jul 18, 2008 1:53 pm Track Changes
The work shall include, but is not limited to supplying all materials, labor, and incidental items necessary to remove existing toilet facilities, construct prefabricated toilets (and modify) with photovoltaic systems (and modify), construct associated aggregate and concreteaccess trails, rehabiliate and seed all disturbed areas, and perform all necessary earthwork and grading necessary to complete the project
Project consists of three different project locations: (1) Peaceful Valley Campground: Located 18 miles North of Nederland. From Boulder, Colorado drive West on Highway 119 to Nederland. Turn North on Highway 72 towards Estes Park. Peaceful Valley is located on the left, about 18 miles from Nederland. (2) Willow Creek Day Use Area: Located 7 miles North of Granby. From Granby, Colorado drive West on Highway 40. Turn North on Highway 34 towards Grand Lake, Colorado. Turn right in about 5.5 miles onto CR 6. Willow Creek is about 1 mile on the left. (3) Monarch Lake Day Use Area: Located 17 miles Northeast of Granby. From Granby, Colorado drive West on Highway 40. Turn North on Highway 34 towards Grand Lake. Turn right in about 5.5 miles onto CR 6. Monarch Lake is at the end of the road, about 10 miles from Highway 34. The desired start of work date for this project is as soon as practicable after contract award. The Contractor will be given 45 days to complete the project. The Government estimate for this project is below $500,000. The solicitation for this project shall be issued on or around July 7, 2008. The solicitation will be available for free download at www.fbo.gov. Proposals will be due approximately 30 days after issuance. There will be a pre-proposal meeting for this project on July 15, 2008 at 10:00 a.m. local time. This pre-proposal meeting will be held at the Peaceful Valley Campground. Peaceful Valley Campground is located 18 Miles North of Nederland, Colorado. From Boulder, Colorado, drive West on Highway 119 to Nederland. Turn North on Highway 72 towards Estes Park. Peaceful Valley Campground is located on the left, about 18 miles from Nederland. All parties who will attend this site visit must RSVP with Christina A. Schofield on or before July 11, 2008 for the pre-proposal meeting by calling 970-295-6635. Attendance is not required to submit a proposal. This project is being set aside for Small Business Concerns. All questions pertaining to this solicitation must be submitted in writing to cschofield@fs.fed.us or via facsimile to 970-295-6699. Only written questions will be addressed. All Offerors must be registered in the Central Contractor s Registry (CCR) in accordance with FAR 52.207-4 to be considered for award. All Offerors must be registered in ORCA in accordance with FAR 52.204-8 to be considered for award. All Offerors must address all Evaluation Criteria in Section M to be considered for award. Offerors who fail to do so will be considered unresponsive.
MODIFICATION ONE TO THIS NOTICE ADDS A SECOND PRE-PROPOSAL MEETING DATE. THE DATE FOR THE SECOND PREPROPOSAL MEETING FOR THIS PROJECT IS JULY 23, 2008 AT 10:00 LOCAL TIME. ALL ATTENDEES SHALL MEET AT THE PEACEFUL VALLEY CAMPGROUND. PEACEFUL VALLEY CAMPGROUND IS LOCATED 18 MILES NORTH OF NEDERLAND, COLORADO. FROM BOULDER, COLORADO, DRIVE WEST ON HIGHWAY 119 T NEDERLAND. TURN NORTH ON HIGHWAY 72 TOWARDS ESTES PARK. PEACEFUL VALLEY CAMPGROUND IS LOCATED ON THE LEFT, ABOUT 18 MILES FROM NEDERLAND. NO RSVP IS REQUIRED FOR THIS MEETING.
Solicitation 1
Sensitive/Secure Package:
no
Posted Date:
June 27, 2008
Description: Keep_This_Copy_Solicitation
Description: Attachment_One_Specifications
Description: Attachment_Two_Location_Map
Description: Attachment_Three_Drawing1
Description: Attachment_Two_Drawing2
Description: Attachment_Three_Drawing3
Description: Attachment_Three_Drawing4
Description: Attachment_Three_Drawing5
Description: Attachment_Three_Drawing6
Description: Attachment_Three_Drawing7
Description: Attachment_Three_Drawing8
Description: Attachment_Three_Drawing9
Description: Attachment_Four_Davis_Bacon_Wage_Rates
Description: Return_This_Copy_Solicitation
Amendment 1
Sensitive/Secure Package:
no
Posted Date:
June 27, 2008
Description: Amendment1_SF30
Description: Amendment1_Attachment1_Revised_SF1442
Amendment 2
Sensitive/Secure Package:
no
Posted Date:
July 7, 2008
Description: Amendment_Two_SF30_Form
Amendment 3
Sensitive/Secure Package:
no
Posted Date:
July 25, 2008
Description: Amendment3_SF30
Amendment 4
Sensitive/Secure Package:
no
Posted Date:
August 5, 2008
Description: Amendment4_SF30_Form
Contracting Office Address:
740 Simms Street
Regional Office
Golden,
Colorado
80401
Place of Performance:
Project consists of three different project locations: (1) Peaceful Valley Campground: Located 18 miles North of Nederland. From Boulder, Colorado drive West on Highway 119 to Nederland. Turn North on Highway 72 towards Estes Park. Peaceful Valley is located on the left, about 18 miles from Nederland. (2) Willow Creek Day Use Area: Located 7 miles North of Granby. From Granby, Colorado drive West on Highway 40. Turn North on Highway 34 towards Grand Lake, Colorado. Turn right in about 5.5 miles onto CR 6. Willow Creek is about 1 mile on the left. (3) Monarch Lake Day Use Area: Located 17 miles Northeast of Granby. From Granby, Colorado drive West on Highway 40. Turn North on Highway 34 towards Grand Lake. Turn right in about 5.5 miles onto CR 6. Monarch Lake is at the end of the road, about 10 miles from Highway 34.
Granby,
Colorado
80549
United States
Primary Point of Contact.:
Christina A Schofield,
Contracting Officer
Phone: 970-295-6635 Fax: 970--295-6699
Secondary Point of Contact:
Julie Major,
Procurement Technician
Phone: 970-295-6681 Fax: 970-295-6699
|
General Information
Notice Type:
Solicitation
Original Posted Date:
June 24, 2008
Posted Date:
August 5, 2008
Response Date:
Aug 07, 2008 4:00 pm
Original Response Date:
Aug 07, 2008 4:00 pm Mountain
Archiving Policy:
Automatic, on specified date
Original Archive Date:
September 7, 2008
Archive Date:
September 7, 2008
Original Set Aside:
Total Small Business
Set Aside:
Total Small Business
Classification Code:
Y -- Construction of structures and facilities
NAICS Code:
236 -- Construction of Buildings/236220 -- Commercial and Institutional Building Construction
|