Government contract and bid
About Us Sitemap Help Sign In
49--Fabricate Trailer Turner for RSMS, Kansas Army National Guard, Ft. Riley, KS
Program Summary
Title: 49--Fabricate Trailer Turner for RSMS, Kansas Army National Guard, Ft. Riley, KS
GovCB Opps ID : ADP12070686640000737
Document Type: Amendment to Combined Synopsis/Solicitation
FSC Code: 49 - Maintenance and Repair Shop Equipment
Set Aside: Total Small Business
Solicitation No.: W912JC-08-R-4002
Source: http://www2.fbo.gov/spg/USA/NGB/DAHA14/W912JC%2D08%2DR%2D4002/Amendment%20to%20Combined%...
Place of
Performance:
Address: USPFO for Kansas 2737 South Kansas Avenue, Topeka KS Postal Code: 66611-1170 Country: US
Posted Date:
Mar 31, 2008
Last Update: Mar 31, 2008
Due Date: Apr 03, 2008

Description
General Information

Document Type: Amendment to Combined Synopsis/Solicitation
Solicitation Number: W912JC-08-R-4002
Posted Date: Mar 31, 2008
Original Response Date: Apr 03, 2008
Current Response Date: Apr 03, 2008
Original Archive Date: Jun 02, 2008
Current Archive Date: Jun 02, 2008
Classification Code: 49 -- Maintenance & repair shop equipment
Set Aside: Total Small Business
Naics Code: 332312 -- Fabricated Structural Metal Manufacturing
Contracting Office Address
USPFO for Kansas, 2737 South Kansas Avenue, Topeka, KS 66611-1170
Description
Responses to vendor inquiry:

10.               The fixture constructed of corrosive resistant metal or coated with a corrosive resistant coating / finish due to weather, water, or humidity.

Q. Is Powder coated mild steel acceptable to meet th is requirement?

A. Powder Coating is acceptable.

11.               Vendor must certify fixture in accordance with accepted industry load bearing standards.

Q.     Is there any particular certification that needs to be met or is this just st ating that the fixture will be up to industry standards?

A. Weight of the heaviest trailer is 11 ton.     Fixture must be certified to carry that weight.     Simply stating the fixture is up to industry standards is not enough.

Note 2:           Final     plan / drawing must be approved by the customer prior to award of the contract.

Q.     Should these plans/drawings be submitted to you, and would you like hard copies or electronic, PDF's.     Could these be reviewed with the customer for feedback?

A. Electronic PDF is acceptable.     The drawings are to be submitted with your proposal to the Contracting Officer by the response date/time. Shop Drawings will be approved prior to Award.     Once the contract is awarded and fixture delivered, the Final Drawing will go to the customer.


Note 3: Fixture must be complete, delivered and set up within 60 days following the award of contract.

Q.     60 days is an extremely short period of time to complete the scope of work called for in this solicitation.     Who will be responsible to decide if this time frame has been met, and what are the consequences if it is not met.     Is it possible that this Note could be ammended?     If so who would make that decision?

A. The time period will be ext ended to delivered/setup 120 days from date of contract award.     The contracting officer with input from RSMS will make the determination.

Q.     Is there a way to fill out and submit provision FAR 52.212-3 electronically?         I found it and printed it     out, but just wondered if there was a way to submit it by E-mail.

A.     It may be updated yearly at https://orca.bpn.gov/
Online Representations and Certifications Application (ORCA)


Q.     Would the signature be accepted if it was on     an E-mailed PDF?

A. Yes


Point of Contact
linda.ehrhart, 785-274-1542
Email your questions to USPFO for Kansas at linda.ehrhart@ng.army.mil
Place of Performance
Address: USPFO for Kansas 2737 South Kansas Avenue, Topeka KS
Postal Code: 66611-1170
Country: US




Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved