Government contract and bid
About Us Sitemap Help Sign In
ECDC CONTROL ROOM AND SERVICE CENTER UPGRADE
Program Summary
Title: ECDC CONTROL ROOM AND SERVICE CENTER UPGRADE
GovCB Opps ID : ADP12240901690000035
FSC Code: c - Architect and Engineering Services - Construction
y - Construction of Structures and Facilities
Solicitation No.: Prj ID: 5044
Source: https://cpms.sanjoseca.gov/pub/BidHotline/contracts/BidList.cfm
Posted Date:
Oct 15, 2008
Due Date: Nov 04, 2008

Description

Prj ID: 5044 ECDC CONTROL ROOM AND SERVICE CENTER UPGRADE
Bid Date: 11/04/2008
Project Manager: Abouzia, Bijan Phone: (408) 535-8343
Division: City Facilities Architectural Services
Address: 200 E. Santa Clara St., 6th Floor, San Jose, CA 95113-1905
Plans & Specs: $25.00 NONREFUNDABLE
Pickup Location: SJ Blue
835 West Julian Street San Jose, CA 95126
www.sjblue.com
Description: The Base bid scope of work for the ECDC Control Room and Service Area Upgrade shall include the relocation of the Control Bridge, relocation of electrical and data wiring, additional new raised flooring, new carpet tile over new and existing raised floor, new rubber base, additional acoustical panels, upgrade wall mounting brackets for flat panels monitor displays, connect data and power to office console units, install new window, remove existing door and painting. Upgrade and remodel of existing toilet rooms and vestibules to comply with ADA standards. Add Alternate No. 1: Remodel existing kitchen and dining room: Removal of existing kitchen cabinets and fixtures, removal of existing ceiling, relocation of walls, removal of existing flooring and base, Upgrade and expansion of Electrical/Communication/Mechanical/plumbing, new cabinets with fixtures, install appliances (owner furnished), installation of new Flooring and base, installation of new ceiling lighting, finishes and painting. Add Alternate No. 2: Remodel perimeter corridor: Preparation and painting of walls, doors and frames, gypsum board ceiling(where occurs), removal of existing resilient base and the installation of new rubber base, removal of existing carpet and installation of new carpet, and preparation and painting (only) of the Elevator Lobbies. Add Alternate No. 3: Office Painting: Rooms 410 through 419, 430, 436, 437, 439, 445, 448, 451, 453, 454, 455, and 474. Preparation and painting of walls, doors and frames, and gypsum board Ceiling (where occurs). Add Alternate No. 4: Office Flooring and Paint: Rooms 402, 403, 404, and 405 Remove existing carpet and base, preparation and painting of walls, doors and frames, and the installation of new carpeting and rubber base.
Engineer's Estimate: $565,000.00
Interested firms shall contact the project manager for any addendum or additional information prior to submission of your documents.
Download documents here
Remarks:




Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved