| EAGLE RIVER LOOP ROAD REHABILITATION |
| Program Summary |
 |
| Description |
 |
EAGLE RIVER LOOP ROAD REHABILITATION Plan Holders List Project# / Federal#: 53936 / MGS-STP-0551(3) Region: Central Bid Opening Date: 3/19/2008 Advertise Date: 2/8/2008 Description: This federally funded project consists of rehabilitation of 1.9 miles of existing two lane paved road. New pavement and striping, widened shoulders, addition of center turn lane, sidewalks along both sides of the road, improved sight distance, and the addition of a signalized intersection at the crossing to Homestead School are also included. DBE Goals(%): 0.0 On the Job Trainees/Apprentices: 3 Hours: 1,700 Engineer's Estimate Range: $5,000,000 to $10,000,000 - Addenda & Notices:
3/4/2008: Notice to Bidders (faxed 03/04/2008) The Bid Opening Date has been delayed until March 19, 2008 at 2:00 p.m. Anchorage time. (vn)
|
|