DEMOLITION OF ABANDONED PIPING AT THE
Program Summary
Title: DEMOLITION OF ABANDONED PIPING AT THE
GovCB Opps ID : ADP12253008340000651
FSC Code: z - Maintenance, Repair or Alteration of Real Property
Solicitation No.: CONTRACT 09-917-11
Source: http://www.mwrdgc.dst.il.us/Contract/Invitation_to_bid/09-917-11.htm
Posted Date:
Oct 29, 2008
Due Date: Nov 25, 2008

Description

NOTICE INVITATION TO BID TO
METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO
FOR DEMOLITION OF ABANDONED PIPING
AT THE STICKNEY WATER RECLAMATION PLANT

CONTRACT 09-917-11

PROPOSALS ARE DUE NOVEMBER 25, 2008

Sealed proposals, endorsed as above, will be deposited in the sealed bid depository in the lobby of the Metropolitan Water Reclamation District Administration Building, 100 East Erie Street, Chicago, Illinois 60611, from the date of the Invitation to Bid, up to 11:00 a.m. on the bid opening date, and will be opened publicly by the Purchasing Agent or her designee at 11:00 a.m. on November 25, 2008.

NO BIDS WILL BE ACCEPTED AFTER 11:00 A.M. ON THE ABOVE SCHEDULED BID DATE. ALL BIDS FAXED OR ELECTRONICALLY TRANSMITTED TO THE METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO WILL BE RETURNED TO THE BIDDER. PROPOSALS TRANSMITTED BY U.S. MAIL OR OTHER DELIVERY WILL BE CONSIDERED ONLY WHEN SAID PROPOSALS ARE IN THE DEPOSITORY AT THE TIME FIXED OF OPENING THEREOF. THE METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO DOES NOT GUARANTEE THAT THE PROPOSAL RECEIVED BY MAIL, OR OTHER DELIVERY, WILL BE DEPOSITED IN THE DEPOSITORY IN TIME FOR SUCH OPENING.

Vendors are invited to furnish all necessary labor and supervision, tools, equipment, material and appurtenances, including transportation, to demolish and dispose of abandoned piping at the Stickney Water Reclamation Plant.

The estimated cost of the work under this Contract is not to exceed $250,000.00.

Proposals must be submitted on proposal forms. Proposal forms are to be placed in the special envelope furnished by the District and shall conform to all the terms and conditions of the Bidding Requirements attached thereto. Bidders are to include with their proposal signed copies of any addenda, or acknowledge receipt of any addenda if the District issued any addenda to this Contract. Failure to do so may be cause for the rejection of any bid.

Specifications, Proposal forms and/or plans may be obtained from the Purchasing Department, Room 508, 100 East Erie Street, Chicago, Illinois, 60611, Monday - Friday, between 8:45 a.m. and 4:15 p.m. Documents will be mailed in response to a fax request #312/7513042. No fee is required for the Contract documents. The District assumes no responsibility for documents sent through the mail.

Each proposal must be accompanied by a bid deposit in the form of cash (U.S. currency only), cashier's check, certified check, or bid bond as stated in the Bidding Requirements and Instructions to Bidders contained in the Contract Documents.

THE BID DEPOSIT FOR THIS PROPOSAL IS $12,500.00.

Prior to award of the Contract, the lowest responsible bidder must demonstrate compliance with the District MultiProject Labor Agreement (MPLA) by submitting to the Purchasing Agent a signed Certification of Compliance with MPLA. The MPLA and Certificate of Compliance are contained in the Contract document.

A Mandatory Pre-Bid Site walk-through will be held on Wednesday, November 12, 2008, at 9:00 a.m., Central Standard Time, at the Stickney Water Reclamation Plant, 6001 West Pershing Road, Stickney, Illinois in Conference Room A266. All prospective bidders shall contact the Resident Engineer, Mr. Raj Vagvala, by November 10, 2008, at (708)588-4187, to identify themselves and inform him of their plans to attend. There will be no questions and answer session during the Mandatory Pre-Bid Site walk-through. Potential bidders may raise any questions they may have at the Mandatory Technical Conference. A Mandatory Technical Conference will be held in the Administration Building Conference Room, at the same location at 11:00 a.m., Central Standard Time, on the same day immediately following the Pre-Bid Site walk-through. The purpose of the Technical Conference is to review the scope of work, to provide for identification and discussion of potential problems that might arise during the administration of this Contract and to seek clarification of technical or procedural aspects of this Contract. All potential bidders are required to sign an attendance sheet at the conference. The sign-in sheet will be used to verify bidder s attendance for the conference. Bidders shall contact the Resident Engineer, Mr. Raj Vagvala at (708)588-4187, Monday through Friday, between 8:00 a.m. and 3:00 p.m., for further information. Bids received from bidders who do not attend both Mandatory Pre-Bid Site Walk-Through and Mandatory Technical Conference will be considered non-responsive.

The bidder shall submit with the proposal a signed and completed Utilization Plan (included in Revised Appendix D), which lists the firms intended to be used as Protected Class Enterprises (PCE's), the type of work or service each PCE will perform, and the dollar amount to be allocated to each PCE.

All bidders must submit with their proposals a signed and completed Utilization Plan which lists each business intended to be used as a Protected Class Enterprises (PCE) on pages D-22, D-23, and D-24. The bidder must sign the signature page D-25 of the Utilization Plan. Failure to submit the Utilization Plan signed by the bidder on page D-25 will be viewed as non-responsive and the bid will be rejected.

All bidders must submit Exhibit B, the Subcontractor s Letter of Intent, page D-26, which must be furnished to each PCE listed in its Utilization Plan to the District within three (3) business days of the bid opening with either a copy of each PCEs current Letter of Certification from a state or local government or agency or documentation demonstrating that the PCE is a MBE, WBE, or SBE within the meaning of the Revised Appendix D. Failure to submit the Subcontractor s Letter of Intent signed by each subcontractor will be viewed as non-responsive and the bid will be rejected. All Exhibit B Subcontractor s Letter of Intent must conform to the Utilization Plan submitted at the time of bid opening. Any change to the Utilization Plan within three (3) business days following the bid opening will be viewed as non-responsive and rejected.

If the bid exceeds the suppliers exception amount allowable which is stated in the bid documents, the bid will be viewed as non-responsive. Therefore, the bidder may not exceed the use of a PCE supplier for commitments more than 25% of each of the respective PCE goals for which the Contract has been authorized unless the Purchasing Agent has authorized a Supplier s Exception as noted on page AU-1.

The Utilization Plan MUST be signed by the bidder, even if the bidder requests a waiver and/or offers itself to meet any of the Revised Appendix D goals. If the bidder offers itself to satisfy any of the Revised Appendix D goals, then its name shall be shown in the appropriate space(s) on the Utilization Plan.

Where a bidder is a business owned and controlled by a minority woman (M/WBE) or where the bidder utilizes a M/WBE in a joint venture or as a subcontractor, the bidder may count the M/WBE participation either toward the achievement of its MBE or WBE goal, but not both.

If a waiver from the Appendix D requirements is sought, the bidder should include with the bid package documentation of good-faith efforts to meet the Appendix D utilization goals. The documentation should be provided with the bid package on the Contractor's Information form; the form is included in the package containing the contract documents. Subsequent to the bid opening, and if it is determined by the Affirmative Action Administrator that a Contractor s Information form is required from the apparent low bidder, the bidder must complete and submit the form within three (3) days of receiving the written request. The work under this Contract is classified Mechanical for the Protected Business Class Enterprise (PCE) Utilization Goals contained in the Revised Appendix D. The associated goals are 20% Minority-owned Business Enterprises, 9% Women-owned Business Enterprises, and 10% Small Business Enterprises.

The bidder to whom the Contract is awarded must be prepared to comply with the requirements of the Affirmative Action Ordinance during the life of the Contract.

For specific information regarding the Contract Specifications, Bidders may contact Mr. Raj Vagvala, Monday through Friday between the hours of 8:00 a.m. and 3:30 p.m. at (708)588-4187.

Bidders should read page R-2, paragraph (6) in regards to questions on this Contract.

If after receipt of the Contract Documents there are any questions regarding procedural details, please contact the Purchasing Department at (312)751-6643.

All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12).

The Metropolitan Water Reclamation District of Greater Chicago reserves the right to reject any or all Proposals.

Metropolitan Water Reclamation District of Greater Chicago
By Darlene A. LoCascio, Purchasing Agent
Chicago, Illinois
October 29, 2008