| Complete Retube of ERI/MB Economizer |
| Program Summary |
 |
| Title: |
Complete Retube of ERI/MB Economizer |
| GovCB Opps ID : |
ADP12179566830000757 |
| FSC Code: |
c - Architect and Engineering Services - Construction
|
| Solicitation No.: |
14007428 |
| Source: |
http://esbd.cpa.state.tx.us/bid_show.cfm?bidid=78234 |
Posted Date: |
Aug 05, 2008 |
| Due Date: |
Aug 19, 2008 |
|
| Description |
 |
| Complete Retube of ERI/MB Economizer |
| Open Date: 08/19/08 10:00 AM
| Agency Requisition Number: 14007428
|
|
NOTE: You will need to download all of the
following files for
complete
specifications and other required document, including a HUB subcontracting plan(if required).
Help: Right Click to and choose
"save file as" or "save target as" to your computer.
-Package 1 size: 207302 (in bytes)
Type:
Additional Specification(s)
Format:
Acrobat PDF Files
-Package 2 size: 184574 (in bytes)
Type:
Additional Specification(s)
Format:
Acrobat PDF Files
|
| Texas State University is seeking competitive bids for the repairs/retubing of a Waste Heat Boiler Economizer located at the Cogeneration Plant on Campus. The Bid will include labor, materials, equipment, supervision and insurance to completely retube the ERI/Nebraska Economizer in the Co-Generation Plant, as per the following Scope of Work. € Provide 96 Cleaver Brooks/ERI/NB Economizer Tubes € Remove the outer casing/lagging at each end of the economizer € Cut the seal welded boxes off from the tube sheets at each end of the economizer € Cut and remove ninety-six tubes (existing) from the unit. € Dispose of cut out tubes € Cut off 48 elbows € Weld Prep 96 ends € Stab 96 tubes into the economizer; tack weld in place € Fit up and tack weld 144 welds to weld tubes in place € Re-install boxes from the tube sheets to each end of the economizer € Re-install the insulation and outer casing/lagging to each end of the unit € Hydrostatically test the economizer unit @ 375 psig. € Make the unit ready for service.
Background on Economizer: The detritus from the plant phased out in the economizer and the unit is totally blocked. It can be isolated from the boiler section but cannot be removed. The detritus includes diatomaceous marl, caliche, calcium, magnesium carbonates and silicates.
Any questions regarding this bid should be directed to one of the following individuals. Gordon Ball/Plant Engineer 512-245-0365 Monte Nusbaum/Crew Supervisor Co-Gen Plant Mechanics 512-245-3604 Kearney Gravis/Crew Supervisor for Control Room Ops.
The attachments include a copy of the Universities Terms and Conditions along with a HUB Subcontracting Form that must be filled out in order for your bid to be considered. The responses can be sent via e-mail to pg11@txstate.edu or faxed to 512-245-1055 by the date and time specified on this posting. |
|
| Agency: TEXAS STATE UNIVERSITY-SAN MARCOS (754)
| | |
| Previous Price Paid:
N/A
|
Solicitation type:
14 Days or more for entire solicitation package
|
NIGP Commodity Code(s):
|
| |
Class-Item: 820
- 14
|
|
| |
Class-Item: 820
- 16
|
|
| |
Class-Item: 941
- 25
|
|
| |
Class-Item: 941
- 51
|
|
| |
Class-Item: 941
- 73
|
| Contact Information: |
| Contact Name: | Pamela Graham |
| Email: | pg11@txstate.edu |
| Address: | 601 University Drive |
| | Facilities Management |
| | San Marcos, TX 78666 |
| Phone: | (512) 245-2833 |
| Fax: | (512) 245-1055 |
|
|