Government contract and bid
About Us Sitemap Help Sign In
54--CLEAR SPAN STRUCTURES - OPERATION SANDCASTLE 2008
Program Summary
Title: 54--CLEAR SPAN STRUCTURES - OPERATION SANDCASTLE 2008
GovCB Opps ID : ADP12029520120001551
Document Type: Combine Solicitation
FSC Code: 54 - Prefabricated Structures and Scaffolding
NAICS Code: 332311 - Prefabricated Metal Building and Component Manufacturing
Set Aside: Total Small Business
Solicitation No.: SANDCASTLE_02
Source: http://www2.fbo.gov/spg/USA/DABK/DABK17/SANDCASTLE%5F02/Combine%20Synopsis%5FSolicitatio...
Place of
Performance:
Address: ACA, Fort Irwin Directorate of Contracting, PO Box 105095 Fort Irwin CA Postal Code: 92310-5095 Country: US
Posted Date:
Feb 13, 2008
Last Update: Mar 12, 2008
Due Date: Feb 25, 2008

Description
General Information

Document Type: Combine Solicitation
Solicitation Number: SANDCASTLE_02
Posted Date: Feb 13, 2008
Original Response Date: Feb 25, 2008
Current Response Date: Feb 25, 2008
Original Archive Date: Apr 25, 2008
Current Archive Date: Apr 25, 2008
Classification Code: 54 -- Prefabricated structures and scaffolding
Set Aside: Total Small Business
Naics Code: 332311 -- Prefabricated Metal Building and Component Manufacturing
Contracting Office Address
ACA, Fort Irwin, Directorate of Contracting, PO Box 105095, Fort Irwin, CA 92310-5095
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice.     This announcement constitutes the only solicitation; proposals     are being requested and a written solicitation will not be issued.

Solicitation number     SANDCASTLE 200802 is issued as a Combined Solicitation/Synopsis.
NTC, Acquisition Command request supplies for the following requirement. (SEE REQUIREMENT DE SCRIPTION).

This requirement is totally set-aside to small business, NAICS: 332311. Only written (fax or email) quotes will be accepted. Quotes must be received no later than 13:00 (1:00 p.m.) PST, 25 February 2008. POINT OF CONTACT:     Ms. Sarah Mun oz-Marquez, 760-380-7035, fax 760-380-3693, sarah.munozmarquez@us.army.mil. Alternate POC is Ms. Mildred Pryor, 760-380-4454, fax 760-380-3693, mildred.pryor@us.army.mil.

REQUIREMENT DESCRIPTION:

Lease and Maintenance Clear Span Structures (s ee below for full understanding of requirement):

REQUIREMENT #1:     CLEAR SPAN STRUCTURES FOR DINING FACILITY (DFAC)

DESCRIPTION:     The contractor shall deliver, setup and maintain two super series 20m x 35m structures with minimum eave heights of ten (10) feet.     These structures shall be placed on two existing concrete pads located in the approximate middle of FOB Santa Fe.     Each unit shall include two (2) entry/exit doors on the ends, a metal halide lighting package, a minimum of twenty (20) 11 0v electrical outlet drops and applicable safety equipment provided by the manufacturer.     The structures shall be open bay with air conditioner units.     The contractor shall securely anchor the structures to withstand 50-70 mph wind gusts of the Fort Irwin area.     Air conditioning duct work shall have manufactured penetrations in the sidewalls.     Sidewalls shall be properly anchored to the ground surface to provide a closed seam with the ground surface.     Seams between the roof and sidewalls shall be sealed or properly overlapped to provide a relatively closed seam that prevents dust infiltration and is waterproof.     The contractor shall provide tables and chairs for 1,200 soldiers at one time.     The contractor shall provide all parts, equipment and maintenance ne cessary to assure proper and continuous, 24-hour functioning of the structures and air conditioners to include weekends and holidays.     The contractor shall restore the ground surface to pre-installation conditions upon pick up of the structures at the comp letion of the contract.

REQUIREMENT #2:     CLEAR SPAN STRUCTURES FOR TROOP BILLETING W/AC

DESCRIPTION:     The contractor shall deliver, setup maintain twelve (12) individual super series 20m x 35m structures with minimum eave heights of ten (10) feet at FOB Santa Fe.     The structures shall be placed in rows at locations determined by the Contracting Officers Representative (COR).     The contractor shall contact the COR as early as possible, but NLT 2 weeks prior to delivery, to coordinate final layd own locations.     The contractor shall grade the entire area for the structures prior to installation.     The extent of grading shall be at least 15 beyond the outer perimeter of each cluster of structures.     The contractor shall provide Plywood flooring that is a minimum of 4 inches above the ground surface with sufficient framing to support live loads with minimal deflection (maximum 1/4 inch per 4 foot) and minimizes dust infiltration from the ground surface for all tents provided for the entire interior gro und surface of each tent.     Each unit shall include two (2) entry/exit doors on the ends, a metal halide lighting package, a minimum of twenty (20) 110v electrical outlet drops and applicable safety equipment provided by the manufacturer.     The structures sh all be open bay with air conditioner units.     The contractor shall securely anchor the structures to withstand typical wind gusts of the Fort Irwin area.     Air co nditioning duct work shall have manufactured penetrations in the sidewalls.     Sidewalls shall be properly anchored to the ground surface to provide a closed seam with the ground surface.     Seams between the roof and sidewalls shall be sealed or properly over lapped to provide a relatively closed seam that prevents dust infiltration and is waterproof.     The contractor shall provide all parts, equipment and maintenance necessary to assure proper and continuous, 24-hour functioning of the structures and air condit ioners to include weekends and holidays. The contractor shall restore the ground surface to pre-installation conditions upon pick up of the structures at the completion of the contract.

*****REPAIR REQUIREMENTS:     The Contractor shall have a designat ed point of contact available 24 hours a day, everyday, for duration of contract. The contractor shall respond to and initiate repairs for all customer repair requests within 4 hours of all requests made prior to 3:00 p.m. local time.     The contractor shall     respond to and initiate repairs for all customer repair requests NLT 7:00 a.m. the following morning for all requests made after 3:00 p.m. local time.*****


EVALUATION FACTORS:

The basis for award is on price and price related factors.

SOLICITATION/CONTRACT CLAUSES
The following provisions and clauses apply to this acquisition:     52.000-4000, Alternate Dispute Resolution; 52-212-1, Instructions to Offerors Commercial Items; 52.212-2, Evaluation of Commercial items; 52.212-3 Offero r Representation and Certifications-Commercial Items; Offerors shall include a completed copy of the provision at 52.212-3; 52.212-4, Contract Terms and Conditions-Commercial items; 52.212-5 Contract Terms and Conditions Required to Implement Statutes or E xecutive orders  Commercial Items.     In paragraph (b) of 52.212-5, the following apply: 52.219-6, 52.219-6, 52.219-27, 52.219-28, 52.222-3, 52.221-21, 52.222-26, 52.222-35, 52.222-.37, 52.222-39, 52.225-1, 52.232-30, 52.232-33; 52.217-8, Option to Extend S ervice; 52.204-7, Central Contractor Registration; 52.000-4032, Army Electronic Invoicing; 252-246-7000 Material Inspection and Receiving Report; 252.219-7003, Electronic Submission of Payment requests; 252.204-7004 Required Central Contract Registration, 252.212-7000           OFFEROR REPRESENTATIONS AND CERTIFICATIONS- COMMERCIAL ITEMS, 252.212-7001 Contract Terms and Conditions Required to Implement Statutes or Executive Orders Applicable to Defense Acquisitions of Commercial Items, In paragrapgh (a) of 252-21 2-7001, the following apply: 52.203-3, Gratuities, In paragrapgh (b) of 252-212-7001 the following apply: 252.225-7001, Buy American Act and Balance of Payments Program, 252.232-7003, Electronic Submission of Payment Requests. This provision may be obtaine d at http://www.arnet.gov/far.    
LOCAL CLAUSES:

52.000-4000       ALTERNATE DISPUTES RESOLUTION

In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, Subpara graph (d) (2) (1) (B) (2), the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties.     Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable, in accordance with the authority and requirements of the ADR Act.

52.000-4032                                                             Army Electronic Invoicing Instructions
                                                                                                                                                     (Feb 2 006)

Contractor shall submit payment request using the following method(s) as mutually agreed to by the Contractor, the Contracting Officer, the contract administration office, and the payment office.

[ X ] Wide Area Workflow (WAWF) (see inst ructions below)

[         ] Web Invoicing System (WInS) (https://ecweb.dfas.mil)

[         ] American National Standards Institute (ANSI) X.12 electronic da ta interchange (EDI) formats (http://www.X12.org and http://www.dfas.mil/ecedi)

[         ]     Other (please specify)_______________________

DFAS POC and Phone: _________________________

WAWF is the preferred method to electronically process vendor request for payment.     This application allows DOD vendors to submit and track Invoices and Receipt/Acceptance documents electronically.     Contractors electing to use WAWF shall (i) register to use WAWF at https://wawf.eb.mil and (ii) ensure an electr onic business point of contact (POC) is designated in the Central Contractor Registration site at http://www.ccr.gov within ten (10) calendar days after award of this contract/order.

WAWF Instructions

Questions concerning payments should be d irected to the Defense Finance and Accounting Service (DFAS) ______________________       at _________________or faxed to ___________________.     Please have your purchase order/contract number ready when calling about payments.

You can easily access paym ent and receipt information using the DFAS web site at http://www.dfas.mil/money/vendor.     Your purchase order/contract number or invoice number will be required to inquire about the status of your payment.

The following codes and information will be     required to assure successful flow of WAWF documents.

TYPE OF DOCUMENT       [check as appropriate]

[         ]       Commercial Item Financing

[         ]       Construction Invoice (Contractor Only)

[     X ]       Invoice (Contractor Only)

[ ]       Invoice and receiving Report (COMBO)

[         ]       Invoice as 2-in-1 (Services only)

[         ]     Performance Based Payment (Government Only)

[         ]     Progress Payment (Government Only)

[         ]     Cost Voucher (Government Only)

[ X ]     Receiving Report (Government Only)

[         ]     Receiving Report with Unique Identification (UID) Data (Government Only)
UID is a new globally unique part identifier containing data elements used to track DOD parts through their life cycle.

[         ]     Summary Cost Voucher (Government Only)

CAGE CODE: ________________

ISSUE BY DODAAC: __W9124B       __

ADMIN BY DODAAC: __W9124B___

INSPECT BY DODAAC: ________________

ACCEPT BY DODAAC: ________________

SHIP     TO DODAAC: ________________

LOCAL PROCESSING OFFICE DODAAC: ____W9124B______

PAYMENT OFFICE FISCAL STATION CODE: ________________

EMAIL POINTS OF CONTACT LISTING: mildred.pryor@us.army.mi and sarah.munozmarquez@us.army.mil

INSP ECTOR:     Government        

ACCEPTOR: __Government_

RECEIVING OFFICE POC: _Ms. Sarah Munoz-Marquez____

CONTRACT ADMINISTRATOR: _Ms. Sarah Munoz-Marquez_

CONTRACTING OFFICER: ____Ms. Marie G. Velez_____

ADDITIONAL CONTACT: _Ms.     Mildred Pryor (Alternate POC)______________

For more information contact: _Ms. Sarah Munoz-Marquez________

COR
The contracting officers representative (COR) will be appointed in writing at the time of contract award.

PAYMENT & INV OICING
All payments for this solicitation/contract will be made by DFAS. The contractor shall include the payment address in the proposal, if it is different from that shown for the offeror.

INVOICING
The contractor shall submit one (1) origi nal copy to the COR, one (1) copy to the designated DFAS,     and one (1) copy to the NTC Acquisition Command, Fort Irwin, CA 92310, ATTN: Ms. Sarah Munoz-Marquez, Fax: 760-380-3693. All payment(s) for this solicitation/contract will be made by DFAS.

F AR Clause 52.000-4032, Army Electronic Invoicing

SOLICITATION CLOSING
The closing date for this solicitation are as follow:

25 February 2008 at/by 1300 hours (1:00 p.m.) PST.

INSTRUCTIONS
Return offer not-later-than 25 February 2 008@ 1300 (1:00 PM) PST to the address shown below via fax, e-mail or mail to Ms. Sarah Munoz-Marquez.

Contractors must be registered in the Central Cont ractor Registration System (CCR).     No contract will be entered into with an un-registered vendor.     Internet access allows vendors to register by completing an electronic on-line application at http://www.bpn.gov/ccr

Provide your Duns and Bradstreet Number:____________________________________

Provide your CCR Cage Code:_____________________________________________

Provide your Federal Tax ID Number:_______________________________________

Provide your email address:________________ _______________________________

POC NTC Acquisition Command:

Ms. Sarah Munoz Marquez
NTC Acquisition Command
PO Box 105095
Fort Irwin, Ca 92310
Tel: 760-380-7035
Fax: 760-380-3693
Email: Sarah.MunozMarquez@us.army.mil

Alternate POC Acquisition Command:
Ms. Mildred Pryor
NTC Acquisition Command
PO Box 105095
Fort Irwin, Ca 92310
Tel: 760-380-4454
Fax: 760-380-3693
Email: mildred.pryor@us.army.mil

IMPORTANT DATES
The contractor shall perfor m in accordance with the following dates:

Mobilization Date:         1 April 2008- 30 April 2008
Actual Period of Performance Date:       1 May 2008  30 June 2008
Demobilization Date:         1 July 2008  31 July 2008

Contractor shall have equipmen t remove from FOB and work site area(s) prior to 1 August 2008.









































Point of Contact
SARAH MUNOZ, 760-380-7035
Email your questions to ACA, Fort Irwin at sarah.munozmarquez@us.army.mil
Place of Performance
Address: ACA, Fort Irwin Directorate of Contracting, PO Box 105095 Fort Irwin CA
Postal Code: 92310-5095
Country: US




Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help
Copyright 2004 GovCB.com All rights reserved