Bid #08-17 Ellsworth Pump Station Upgrade
Program Summary
Title: Bid #08-17 Ellsworth Pump Station Upgrade
GovCB Opps ID : ADP12082742690000565
FSC Code: y - Construction of Structures and Facilities
Source: http://www.cityofvancouver.us/purchasing.asp?menuID=10464&submenuID=10524&itemID=15442
Posted Date:
Apr 14, 2008
Due Date: May 06, 2008

Description
Bid #08-17 Ellsworth Pump Station Upgrade

Current planholders list: Available on the Builder's Exchange Web site.

Project Description: The work is divided into two distinct projects. Bid packets are presented as Contract A Schedule € Potable Water Pump Station and Transmission Main; and, Contract B Schedule € Stormwater Surface Infiltration Facility and Transmission Main Landscape Restoration. Bidders may provide bids for either Schedule or both. Note that awarded contractor must self perform 75% of the Work for Contract B Schedule. Contract A Schedule includes construction of a new 3200sf building, 7500gpm potable water pump station, including pumps and valves, together with associated site work which includes site grading, erosion control, new asphalt paving, concrete walkways around new pump station, electrical work, and instrumentation. Also includes the construction of approx. 300ft of new 24-inch suction pipe and approx. 1400ft of 24-inch transmission main (including valves and other various appurtenances), 160ft of 24-inch storm drain piping, appurtenances, a stormwater quality treatment facility and other work to complete the project as shown in the Contract Documents. The Owner desires to use S&B; Inc. as the sole source provider of programming and telemetry for this project. The Contractor is required to use S&B; Inc for the programming and telemetry associated with Contract A Schedule. Contract B Schedule includes construction of a new stormwater surface infiltration facility, including site grading, erosion control, swales, check dams, mitigation plantings, and irrigation. Also includes the restoration planting within the Contract € A € Schedule 24-inch transmission main and 24-inch storm drain construction areas except within pavement areas and other work to complete the project as shown in the Contract Documents.

There will be a non-mandatory pre-bid meeting Tuesday, April 22nd at 1:00pm at nearby City of Vancouver Marine Park Engineering Services, 4500 SE Columbia Way, Vancouver WA 98661. Attendance is highly encouraged.

Opens: Tuesday, May 06, 2008

Project Estimate: A - $3.5 - $4.3 Million: B - $208,000 - $253,000

Project Manager: , (360) 696-8223 ext. 8492

Procurement Services Contact: , (360) 619-1031

Project Questions:
View submitted questions and answers about this project.

Plan and specifications: Available on the Builder's Exchange Web site at no charge.

Builder's Exchange Web site will open in a new browser window.

Plan Fee: $100.00 + $8.20 (tax) = $108.20

Addendum: None





Home - Browse By Keyword - Browse By Region - About Us - Privacy Policy - Terms of Use - Sitemap - Help